29
3062165_201508
Roof integration - Slate roof
15-60°
1. Loosely place tiles and upper edging panel in their final position.
2. Fit top lift plate and cut to size. Ensure sufficient overlap (8-10 cm).
3. Firmly secure lift plate and tiles.
4. Depending on the size and overlap of the tiles a dimension X results, by
which the collector must be raised in order to fit the upper edging panel.
=> Remove upper edging again and place a suitable spacer block under
the top mounting rail.
5. Pre-drill through the rail + spacer block with Ø 5 mm bit and secure to the
rafters with 8 x 80 hexagonal screws.
6. Affix upper edging panel to the collector and place in final position.
Loosely place tiles and upper
edging panel in final position
Dimension X
Dimension X
Fitting the top edging panel
Summary of Contents for TopSon F3-1
Page 51: ...51 3062165_201508 Notes...