Commissioning check list
No.
Installation
1
Collectors installed safe in case of storms
O
2
Solar line connected to the earthing system
O
3
Blow-off line permanently secured to the safety valve of the solar circuit
O
4
Drip container positioned below the blow-off line (solar circuit)
O
5
Blow-off line fitted to the safety valve and connected to the drain
O
6
Thermostatic mixing valve installed at the DHW outlet or cylinder temperature limited
to 60 °C by the control unit
O
O
Commissioning
7
Expansion vessel inlet pressure (check prior to filling) ___________bar
O
8
Solar circuit filled and flushed with heat transfer medium
O
9
Pump, cylinder indirect coil and collector vented (block gravity brake for venting
purposes)
O
10
Air vent trap on the collector vented (if installed)
O
11
Solar circuit pressure tested, incl. leak check on all threaded, solder and compression
fittings
O
12
All joints (glands on shut-off valves and fill & drain valves) leak tested
O
13
System pressure (cold) _________bar
O
14
Gravity brake function OK
O
16
DHW cylinder filled and vented on the DHW side
O
17
Shading of collectors removed
O
Control systems
18
Temperature sensors indicate realistic values
O
19
Solar circuit pump running - circulates heat transfer medium; poss. adj. (flow meter:
_________l/min)
O
20
Solar circuit and cylinder are getting warm
O
21
Boiler boosting starts at: ________°C
O
22
Option: DHW circulation pump runtime from ______ h to _____ h
O
Instruction: The system user has been instructed as follows:
23
Basic function and operation of the solar control unit incl. DHW circulation pump
O
24
Instruction in the inspection options of the protective cylinder anode
O
25
Service interval
O
26
Handover of documents
O
27
Confirmation of the commissioning by the system user
O