44
3062165_201508
Inspection and service checklist
Date:
Date:
Collector inspection
- Visual collector inspection
O
O
- Visual inspection of the collector fixings
O
O
- Visual inspection for potential leaks in the roof
O
O
- Visual inspection of the thermal insulation on pipework
O
O
Solar heating circuit
- Visual inspection for potential leaks in the solar circuit (joints)
O
O
- Colour check of the ANRO heat transfer medium
O
O
- pH value test of ANRO heat transfer medium only in case the medium has
turned brown; poss. replacement
pH_____
pH_____
- Frost protection level of the heat transfer medium checked.
_____°C
_____°C
- Safety valve tested
O
O
- Solar expansion vessel inlet pressure tested (for this, release pressure from
expansion vessel).
_____bar
_____bar
- In case of noisy pumps or system pressure fluctuations vent the system; for
this, block the gravity brake
O
O
- System pressure in a cold system state (see system operating pressure)
_____bar
_____bar
- Reactivate the gravity brake
O
O
Solar cylinder and DHW circuit
- Protective anode inspection
O
O
- Check for scale build-up in the cylinder and on the thermostatic mixing valve;
poss. carry out de-scaling
O
O
- Check the anti-scalding protection (thermostatic mixing valve or via the
maximum cylinder temperature limit)
O
O
Control systems
- Check control parameters and display values for plausibility
O
O
- Solar circuit pump running - circulates (poss. adj. and checking on the flow meter) _____l/min
_____l/min
- Temperature of boiler boosting tested
_____°C
_____°C
- Option: DHW circulation pump runtime checked
O
O
Summary of Contents for TopSon F3-1
Page 51: ...51 3062165_201508 Notes...