13
9 .
C E R A M I C F U E L B E D I N S T A L L A T I O N
9.1.
Ceramic Walls Installation
1. Locate the ceramic rear wall in the channel at back of the firebox and flat against the
back of the firebox. See figure 23.
2. Locate the side walls in the channels at the sides of the firebox. See figure 24.
3. Remove two screws from under the top front of the firebox. Using these screws, fit
the port cover. See figure 25.
Figure 25
Figure 24
Figure 23