MOULDER ASSEMBLY
Unpacking the Moulder
MOULDER ASSEMBLY
15doc030112
3-9
3
3.2
Unpacking the Moulder
1.
Cut the bands holding the components together.
2.
Remove the parts arranged inside the bed section.
3.
Attach the winch hook to the bracket on the head. Using a forklift truck or a winch with lifting capacity of at
least 500 kg, carefully lift the head and set it aside.
WARNING!
When removing the head, use extreme caution and keep all
persons at a safe distance. Failure to do so may result in serious injury or
death.
See Figure 3-1.
3.3
Bed Frame Assembly
IMPORTANT!
For all screw joints without a split lock washer or a nylon
lock nut, use "LOCTITE 243" (blue, of average durability, for screw joints).
1.
Mount preliminarily the track rail as shown in the Figure 3-2. Do not tighten the nuts.
FIG. 3-1
500kg
!