Remote Operation
Machine and Site Preparation
1
1-3
ROdoc070822
Remote Operation
1.2
Machine and Site Preparation
The Wood-Mizer LT70 Remote-ST sawmill has to be prepared to work after
transportation. Due to the weight, it has to be transported with auxiliary carrier equipment
and in accordance with general safety rules.
The moulder must be installed in the work-place as instructed in the operator’s manual.
To ensure safe operation of the machine, the work-place dimensions should be
13 m x 3,5 m. If your machine is equipped with bed extension, prepare an appropriately
larger work area. The work-place must be protected from rain and snow.
Before sawmill setup remove the control panel from the sawmill bed frame.
FIG. 1-2