Sawmill Operation
Preparing The Sawmill For Towing
Sawmill Operation
60HD-R04doc112210
4-19
4
2.
Move the clamp all the way in toward the main bed frame tube.
CAUTION!
Move the hydraulic clamp and turner to provide
maximum ground clearance before towing. Failure to do so
may result in damage to the sawmill.
3.
Use the hydraulic controls to raise the log turner and loader as high as they will go. Man-
ually lift the loader and hook the loader chain to the turner. Use the hydraulic turner lever
to lower the turner until the chain is tight. Push the loader lever down to bring the loader
arm channels up to the loader.
4.
Move the carriage forward to the travel position over the rear bed rail.
5.
Position the hole in the saw head over the travel rest pin.
6.
Lower the saw head until it is seated firmly on the rest pin.
7.
Secure the rest pin in the vertical position with the locking pin.
See Figure 4-9.
8.
Continue lowering the head 3/4" (19mm) until it contacts the stop block at the bottom of
the mast.
CAUTION!
It is important that the lower stop bolt is properly
adjusted to secure the carriage on the track rail. Failure to
properly adjust the stop bolt can cause saw head damage,
especially during mill transportation.
FIG. 4-9
HD0075
Rest Pin
Lock Pin