Setup
Assemble the bed sections
Setup
LX25 4/8/21
3-13
3
5.
Attach the log rest brackets and posts.
(See FIG. 3-5 .) Do not tighten
until the bed is lev
-
eled.
3.2 Level the bed
The tools needed are:
Shims
4 foot level or laser level
Lag bolts and washers
Socket and ratchet for lag bolts
Wooden skids, 4x4 or better
NOTE:
It is important that the bed be level for the sawhead to travel
smoothly over the rails.
1.
Mount the saw bed on wooden skids for leveling and increasing the ground clearance. A
straight 4x4 or 4x6 are an ideal size for the wooden skids. If the skids are not a solid
FIG. 3-5
TDLX25-04
Log Bracket
Posts