Setup
Install the mast
Setup
LX25 4/8/21
3-19
3
NOTE:
This prevents the sawhead from sliding up the mast while
mounting it.
T
5.
Raise the sawhead to the upright position.
6.
Install the entire head and mast assembly on the bed rails.
NOTE: Make sure that the main roller bearings are still riding
smoothly on the rail.
The bearing can be slightly re adjusted by loos
-
ening and re-tightening the bolts.
7.
When the carriage and mast are properly aligned, tighten or re-tighten
all
bolts in the mast
uprights and the carriages.
8.
With the sawhead at the head of the bed, (either end may be designated as the head)
attach two lower segments of the catch rail.
FIG. 3-13
T
10010-
3
Stop Pins