background image

R

WOODBRIDGE 

R

WOODBRIDGE 

R

WOODBRIDGE 

R

WOODBRIDGE 

R

WOODBRIDGE 

R

WOODBRIDGE 

www.woodbridgebath.com

12

READ BEFORE INSTALLATION:

1. Installer MUST follow the circuit diagram and technical data provided by manufacturer during the 
     installa on.
2. Ground onthe control panel must connect to circuit diagram with ground.
3. Installer must use a cer

fi

ed speci

fi

ca on of 3x3mm diameter or thicker wire, and power outlet must 

     be 30A or higher grand for installa on.
4. Installer MUST buy a 30A or higher grade of Air switch or leakage switch.  The leakage switch on unit 
     itself is for support use only.
5. Check and make sure the wiring and rou ng on wiring hub is correct per speci

fi

ca on.  use only when

     it is per factory speci

fi

ca on.

6. DO NOT apply any non-factory cer

fi

ed components or equipment to the control panel, it is prohibited

     to disassemble or modify any of the wiring or unplug and reconnect the wire when it Power box is s ll   
     with power.
7. The wiring and connec on on power box must match with the diagram, output cannot be short circuit.
8. It is highly recommended to shut down the unit a er use to prevent aging caused by con nuous electric 
    current.
9. Control Box must be installed by cer

fi

ed installer and following installa on instruc on.

10. None of the component inside the control box can be resume, DO NOT try to improve nor repair.  
       High voltage inside the control box will caused severe body injury.  Any maintenance or alignment 
       must be serviced by cer

fi

ed technician.

[DISCLAIMER]
1. This product must be serviced by cer

fi

ed technician authorized by manufacture or it’s dealer or

     warranty will be voided, and manufacture has no responsibility to any cost or lost caused.
2. This installa on manual is for reference only and is subject to change without any prior no ce.

Summary of Contents for B0090

Page 1: ...oviding any compliance cer fica ons Under no circumstances we shall not be liable for any incidental damages sustained in connec on with this product Neither manufacture nor distributor nor retailer i...

Page 2: ...ll help you avoid costly mistakes In addi on to proper installa on read all opera ng and safety instruc ons IMPORTANT INFORMATION Measurements are 1 2 and subject to change without no ce Specifica ons...

Page 3: ...ng Preparation Posi on the plumbing according to rough in dimensions Cap the supplies and check for leaks BEFORE INSTALLING UNIT CAUTION Ensure a watertight seal on the bath drain connections A Instal...

Page 4: ...factory tested and approved It is the responsibility of the installer to test run the bathtub check all the fi ngs for leaks and test the control func ons NON OBSERVANCE WILL INVALIDATE FACTORY WARRA...

Page 5: ...en it Adjust it to be level Reconnect 1 Voltage HZ needs match up with the product s parameter 2 Power supply needs a good grounding 3 The pressure of water supply needs meet 0 2 0 4Mpa 4 The Whirlpoo...

Page 6: ...unc on switch valve E uent Shower Cold water pipe 1 5m Hot water pipe 1 5m Hot Cold GROUND NEUTRAL L1 THE LEAKAGE SWITCH L1 NEUTRAL GROUND The control panel Force regula ng valve Display window Switch...

Page 7: ...R OODBRIDGE WOODB R OODBRIDGE WOODB OODBRIDGE WOODB www woodbridgebath com 7 Service Access Door Service Access Door Tub Rim Service Access Door LED light indicator...

Page 8: ...reference a er installa on Please contact your local authorize dealer or call our customer service support for any assistance with opera on or maintenance related ques on OPERATION TIPS 1 Unplug the...

Page 9: ...ter level detec on Child Keypad Lock Touch Sensor technology 2 Control system Keypad x1 Control Box x1 3 Control Box Specifica on Voltage AC110V Hertz 60 Hz Consume Voltage 25A Standby Rate 1W Working...

Page 10: ...perature on LCD screen Display will blink if it is not equipped with Press and hold Power Func on bu on for 3 seconds to power o the unit 3 CHILD Keypad Lock The unit is On and no ac vity on the keypa...

Page 11: ...quence indictor will be blinking Current temperature Water Pump Timer for water pump Defaulted temperature Air Blower Constant heated LED lightson bo om Note 1 Default opera ng me for water pump is 45...

Page 12: ...to disassemble or modify any of the wiring or unplug and reconnect the wire when it Power box is s ll with power 7 The wiring and connec on on power box must match with the diagram output cannot be sh...

Page 13: ...ts should be installed by a fully insured and licensed contractor only Installa on by anyoneother than fully insured and licensed contractorwillvoid this limited warranty This warranty does not cover...

Page 14: ...ets are closed Suc on cover strainer may be clogged Open jets by rota ng counter clockwise with the motor turned OFF remove the suc on cover strainer and remove any debris Replacethe suc on cover befo...

Page 15: ...shine is restored Repair and Maintenance The bathtub must be installed and used as described in this manual Use cau on when entering or exi ng the bathtub Do not permit children or persons with infir...

Reviews: