R
WOODBRIDGE
R
WOODBRIDGE
R
WOODBRIDGE
R
WOODBRIDGE
R
WOODBRIDGE
R
WOODBRIDGE
R
WOODBRIDGE
R
WOODBRIDGE
www.woodbridgebath.com
INSTALL BATHTUB
1) Your new bathtub has been manufactured to the highest possible standards,it has been tested
and approved by factory
INSTALLATION REQUIREMENTS
A. Tools Required
• Adjustable pipe
• wrench
• Ruler
• Level
• Safety shoes
• Safety glasses
• Square
• Screwdriver
• Pliers
• U lity knife
B. Materials Required:
• Plumbers pu y
• Wall coverings, as necessary
• Silicone sealant
• Gypsum cement (op onal)
• Construc on adhesive
• (op onal)
• Protec ve covering for
• bathtub
• Nails
C. Clearance Requirements:
Check the rough-in and room dimensions to provide adequate space for the bath unit.
SITE REQUIREMENTS
A. Plumbing Preparation
Posi on the plumbing according to rough-in dimensions.
Cap the supplies and check for leaks.
BEFORE INSTALLING UNIT
CAUTION:
Ensure a watertight seal on the bath drain connections.
A. Install the faucet valving and shower head tee.When drilling bathtub for faucet,
ensure su
ffi
cient clearance. Open the hot and cold water valves and check the
supply connec ons for leaks.
B. Run water into the bath and check the drain connec ons for leaks.
C. Fill the bathtub up to the over
fl
ow level and check over
fl
ow unit for leaks.
3
This products must be installed by a fully insured and licensed plumber only.
2)
When removing bathtub from protec ve carton. DO NOT LIFT BATHTUB BY PIPE WORK.
Inspect for any possible damage that may have occurred in transit.
IMPORTANT: Bathtub must be installed level on all top edges..