R
WOODBRIDGE
WOODBRIDGE
WOODBRIDGE
WOODBRIDGE
R
WOODBRIDGE
WOODBRIDGE
WOODBRIDGE
WOODBRIDGE
R
WOODBRIDGE
WOODBRIDGE
WOODBRIDGE
WOODBRIDGE
R
WOODBRIDGE
WOODBRIDGE
WOODBRIDGE
WOODBRIDGE
R
WOODBRIDGE
WOODBRIDGE
WOODBRIDGE
WOODBRIDGE
R
WOODBRIDGE
WOODBRIDGE
WOODBRIDGE
WOODBRIDGE
R
WOODBRIDGE
WOODBRIDGE
WOODBRIDGE
WOODBRIDGE
R
WOODBRIDGE
WOODBRIDGE
WOODBRIDGE
WOODBRIDGE
R
WOODBRIDGE
WOODBRIDGE
WOODBRIDGE
WOODBRIDGE
3
INSTALL BATHTUB
1) Your new bathtub has been manufactured to the highest possible standards,it has been tested
and approved by factory
INSTALLATION REQUIREMENTS
A. Tools Required
• Adjustable pipe
•
wrench
• Ruler
• Level
• Safety shoes
• Safety glasses
• Square
•
Screwdriver
•
Pliers
• Utility knife
B. Materials Required:
•
Plumbers putty
• Wall coverings, as necessary
•
Silicone sealant
• Gypsum cement (optional)
•
Construction adhesive
• (optional)
• Protective covering for
•
bathtub
•
Nails
C. Clearance Requirements:
Check the rough-in and room dimensions to provide adequate space for the bath unit.
SITE REQUIREMENTS
A. Plumbing Preparation
Position the plumbing according to rough-in dimensions.
Cap the supplies and check for leaks.
BEFORE INSTALLING UNIT
CAUTION:
Ensure a watertight seal on the bath drain connections.
A. Install the faucet valving and shower head tee.When drilling bathtub for faucet,
ensure sufficient clearance. Open the hot and cold water valves and check the
supply connections for leaks.
B. Run water into the bath and check the drain connections for leaks.
C. Fill the bathtub up to the overflow level and check overflow unit for leaks.
This products must be installed by a fully insured and licensed plumber only.
2)
When removing bathtub from protective carton. DO NOT LIFT BATHTUB BY PIPE WORK.
Inspect for any possible damage that may have occurred in transit.
IMPORTANT: Bathtub must be installed level on all top edges.