2
ROUGHING-IN
Roughing-in:
INSTALLATION REQUIREMENTS
A. Tools Required
Ɣ
Adjustable pipe
Ɣ
wrench
Ɣ
Rule
Ɣ
Level
Ɣ
Safety shoes
Ɣ
Safety glasses
Ɣ
Square
Ɣ
Screwdriver
Ɣ
Pliers
Ɣ
Utility knife
B. Materials Required:
Ɣ
Plumbers putty
Ɣ
Wall coverings, as necessary
Ɣ
Silicone sealant
Ɣ
Gypsum cement (optional)
Ɣ
Construction adhesive
Ɣ
(optional)
Ɣ
Protective covering for
Ɣ
bathtub
Ɣ
Nails
1) Set the bathtub on two 4x4 pieces of lumber .so you can access from the bottom
of the bathtub.
2) Fill bathtub with cold water above the jets and trial run pump for 10-15 minutes.
Check all the fittings for leaks and test the control functions. Switch off the pump
and leave the unit filled with water (pump is not running) for at least another two
minutes. Check the pump and pipes union connections for leaks. Hand tighten
union connections if required.
3) Pls check the drain and overflow are properly sealed and tightened , if a leakage
occurs , pls disassemble the drain line or overflow assemblies and apply a
plumbing Teflon tape /silicone calk to the fix the leakage.
4) This products must be installed by a fully insured and licensed plumber only.
IMPORTANT BEFORE INSTALLATION:
22 7/8"
16 7/8"
66 1/2"
41 3/4"
31 7/8"
20 1/2"