2 Instrument Configuration
Copyright © WOODLEY EQUIPMENT COMPANY LTD.
15
➢
Discharge of waste from the WBC bath
Valve LV14, LV15 and Pump P1 are opened to discharge any waste from the WBC bath.
➢
Discharge of waste from the RBC/PLT bath
Valve LV13, LV15 and Pump P1 are opened to discharge any waste from the RBC/PLT bath.
➢
Discharge of waste from the impedance counting bath
After any waste from impedance counting (RBC/PLT counting) flows through the aperture
and after any waste that results from cleaning the rear section of the RBC/PLT bath flows into
the negative-pressure chamber, Valve LV15 and Pump P1 are opened for waste discharge.
2.2.8 Status Monitoring Module
This module involves:
⚫
Monitoring of V5 DIL
Detection is done by way of a floating sensor; the float moves downwards, the diluent level falls,
and an alarm is activated when it reaches empty.
⚫
Monitoring of V5 LY1
A reflecting optocoupler is used to monitor the V5 LY1 level; as it gets lowe
r, the optocoupler’s
status changes until an alarm is activated once there is no V5 LY1 left.
⚫
Monitoring of V5 LY2
A reflecting optocoupler is used to monitor the V5 LY2
level; as it gets lower, the optocoupler’s
status changes until an alarm is activated once there is no V5 LY2 left.
⚫
Monitoring of waste overflow
Waste overflow is done by way of a floating sensor; as waste levels rise, the float moves upward
until it eventually activates an alarm indicating that it is full.
2.2.9 Hydraulic Components
List of Hydraulic Components
No.
Component
No.
Illustration
Material
No.
Function Description
Remarks
1
Sample
probe
56.01.0163
A
Collects blood samples in
the testing tube and
dispenses a certain portion
of the sample to be placed
in the corresponding
counting bath
None
2
Swab
20.01.098
4A
Cleans the outer and inner
walls of the sample probe
None