This stove has been tested for and must be installed on a
floor
protector with the proper Thermal Resistance or R-value
as stated in step 1 of the installation instructions under “Locating Stove” section of this manual. If the
floor
protector ma-
terials listed in the instructions are not available, materials with an equivalent R-value may be substituted.
Alternate materials may be rated with C-factor (Thermal Conductance) or k-factor (Thermal Conductivity) ratings
which must be converted to R-value to determine if the alternate material meets the tested requirements. The following
instructions provide the proper information and formulas for conversion to R-value.
To determine if alternate materials are acceptable follow this sequence.
1. Conv
ert material specifications to R-
value:
a. R-value given — no conversion necessary
b. K-factor is given with a required thickness (T) in inches:
R = 1/k x T
c. C-factor is given: R = 1/C
2. Determine the R-v
alue of proposed alternate floor prot
ector:
a. Use formulas in step 1 above to calculate R-value of proposed material(s).
b. For multiple layers, add R-values of each layer to determine overall R-value.
3. If the overall R-value of the
floor
protector system is equal to or greater than the
floor
protector
specifications
given,
the alternate is acceptable.
Definitions:
Thermal conductance(C) =
BTU
=
W
(hr)(ft
2
)(°F)
(m
2
)(°K)
Thermal conductivity (k) =
(Btu)(inch)
=
W
=
Btu
(hr)(ft
2
)(°F)
(m)(°K)
(hr)(ft)(°F)
Thermal resistance (R) =
(ft
2
)(hr)(°F)
=
(m
2
)(°K)
Btu
W
Example:
The specs of floor protector material should be 3/4-inch thi
ck material with a k-f
actor of 0.84.
The proposed alternativ
e material is 4” brick with a C-
factor of 1.25 over 1/8-inch mineral board
with a k-factor of 0.29.
Step 1: Convert specs to R-value.
R = 1/k x
T = 1/0.84 x 0.75 = 0.893 System must h
ave a R-value of 0.893 = Rspecs
Step 2: Calculate R-value of individual components
4” Brick with C-
factor = 1.25. R = 1/C = 1/1.25 = 0.80 = Rbrick
1/8-inch (0.125”) mineral board with k-factor = 0.2
9. R = 1/0.29 x 0.125 = 0.431 = Rmin.brd.
Step 3: Add R-values of components to get total R-value of system
Rmin.brd = 0.80 + 0.431 = 1.231 = Rsy
stem
Step 4: Compare Rsystem to Rspecs
Rsystem = 1.231 is larger than Rspecs of 0.893. System R-value exceeds the required
specifications and therefore is an acceptable alter
native.
FLOOR PROTECTOR MATERIAL CALCULATIONS
32
Summary of Contents for WS-TS-1500
Page 6: ...6 Minimum Clearances for installation according to UL 1482 US ULC S627 CAN A ...
Page 7: ...7 Top A A Alcove ...
Page 8: ...philips BLOWER ATTACHMENT 8 4 places A GASKET ...
Page 9: ...9 WS TS 2500 23 8 6 ...
Page 10: ...10 6 ...
Page 20: ...20 ...
Page 21: ...21 ...
Page 23: ...23 BAFFLE REMOVAL ...
Page 24: ...24 BAFFLE REMOVAL ...
Page 25: ...SERVICE PARTS 25 ...
Page 26: ...SERVICE PARTS 26 ...
Page 27: ...SERVICE PARTS 27 ...
Page 28: ...SERVICE PARTS 28 ...
Page 29: ...SERVICE PARTS 29 ...
Page 30: ...SERVICE PARTS WS TS 2500 30 ...
Page 33: ...DATE OF SERVICE PERFORMED BY DESCRIPTION CHIMNEY STOVE MAINTENANCE LOG 33 ...
Page 35: ...Warranty 35 ...
Page 36: ...36 www woodprostoves com 2 ...