Disassembly
CTC181210-POSH 07/17
Step 4 : Erect the roof
1) Unzip the doorway and attach door poles
inside the doorway.
2) Insert each pole into webbing pockets
at the bottom and top of the doorway.
3) Extend pole until silver button locks into
the slot. Listen for the click.
4) Insert vertical door pole in webbing pocket.
1) Inside the screen house, remove the strapping from the roof poles.
2) Raise the poles upward to extend and lock each pole.
3) At each corner using the loop as an aid, insert pole end into the webbing pocket.
4) Attached hook and loop fasteners around the poles along the seams
1) Position skirt along the outside perimeter of the screen house. At the corners hammer stakes
through the grommets into the ground at a 45° angle using a hammer or mallet.
2) On the inside, install stakes through the grommets on tabs at each corner.
3) Secure guy lines with stakes.
Step 6 : Stake the screen house and secure guy lines
1) Remove all stakes and fold guy lines.
2) Collapse the roof one pole at a time. Unfasten hook and loop fasteners and remove pole
end from webbing pocket. Depress button and compress the pole.
3) Remove door legs.
4) Collapse each wall, pushing inward at the center hub.
5) Once flat, fold and roll screen house. Place in the carry bag.
6) Place stake and door poles in their bags inside the carry bag
Note: Screen house must be clean and dry before storage. Store in a clean dry area
off concrete.
2