INSTALLATION,OPERATION & MAINTENANCE
Woodson Contact Toaster – WGPC61
Tel: 1300 79 1954 Web: www.stoddart.com.au Email: fse@stoddart.com.au
Due to continuous product research and development, the information contained herein is subject to change without notice
Page 7
Setting Up
Handling
Use suitable means to move the appliance: eg. A lift truck or fork pallet trucks (the forks should
reach more than halfway beneath the appliance).
Site Preparation
Ensure the site is level and properly cleaned.
The toaster is to be placed on a suitable bench or worktop, at a comfortable working height. (850mm –
900mm)
Ensure the press toaster is placed on a level, stable work surface, away from other heat, water or grease
emitting devices.
Unpacking
Check the machine for damage before and after unpacking. If machine is damaged, contact the
dealer.
Wear protective gloves to unpack the appliance from the box.
The unit is supplied fully assembled.
Unpack and visually inspect the unit for damage or missing parts. Report any problems to the distributor
or manufacturer.
Remove all protective plastic film, tapes, ties and packers before installing and operating. Clean
off any glue residue left over from the protective plastic film.
Wipe all surfaces with a clean, sanitised cloth.
First Time Operation
Read the complete instruction manual before proceeding.
The toaster is preset in the factory with the following settings:
o
Cooking temperature 205 degrees C.
o
The timers have not been factory set.
o
Refer to Section“ Setting the timers” Page 13
Plug the unit into a power source. Ensure the electrical cable is not damaged and does not hang over the
counter, and the “ON/OFF” button is set to the “OFF” position.
Your toaster is ready to use.
Summary of Contents for WGPC61
Page 29: ......