Manual 26824
CPC-II Unit Replacement Procedure
Woodward
35
Before performing this step please review TWIN – Terminals wires handling
system ( #15 and # 16 ) - see Figure 3-2.
Do NOT turn on hydraulic lines before complete mechanical and
electrical unit installation process.
Install all wires inside Electrical Terminal Box according to Figure 1-5. (CPC’s
wiring diagram) and Figure 1-6. (Electrical Terminal Box, wiring diagram).
Use torque screwdriver to install wires in terminals, Type: Slotted; Tip Size: 0.6 x
3.5 mm. Torque to 5.3 – 7.0 lbf-in (0.6 – 0.8 Nm) CW direction.
Figure 5-6. CPC-II wires installation.