Installation and Connection
TUr X Voltage Measuring Inputs
The device is provided with 4 voltage measuring inputs: three for measuring the phase-to-phase voltages (
»V12«
,
»V23«
, »V31«) or phase-to-neutral voltages (»VL1«, »VL2«
, »VL3«
) and one for the measuring of the residual
voltage »
VE
«. With the field parameters the correct connection of the voltage measuring inputs has to be set:
phase-to-neutral (star)
phase-to-phase (Open Delta respectively V-Connection)
Ensure the correct tightening torques.
The rotating field of your power supply system has to be taken in to account.
Make sure that the transformer is wired correctly.
For the V-connection the parameter »VT con« has to be set to »phase-to-
phase«.
Please refer to the Technical Data.
57
MCDLV4
DOK-HB-MCDLV4-2E
0,56 - 0,79 Nm
5-7 lb·in
0,3 Nm
2.65 lb·in
Summary of Contents for HighPROtec MCDLV4
Page 3: ...Order Code Order Code 3 MCDLV4 DOK HB MCDLV4 2E...
Page 47: ...Installation and Connection 47 MCDLV4 DOK HB MCDLV4 2E...
Page 164: ...Input Output and LED Settings 164 MCDLV4 DOK HB MCDLV4 2E...
Page 433: ...Parameters 433 MCDLV4 DOK HB MCDLV4 2E...
Page 457: ...Device Parameters 457 MCDLV4 DOK HB MCDLV4 2E...
Page 473: ...Blockings 473 MCDLV4 DOK HB MCDLV4 2E...
Page 988: ...Protective Elements 988 MCDLV4 DOK HB MCDLV4 2E P P Q P Q P Q Q Q P S S...
Page 989: ...Protective Elements 989 MCDLV4 DOK HB MCDLV4 2E Pr Q P Q P Qr...
Page 1023: ...Protective Elements 1023 MCDLV4 DOK HB MCDLV4 2E...