Mark the wall where the flue will terminate to suit the
installation.
This is the Side Flue Extension centre point position. See Fig. 13.
FLUE OPTION 8.
See Fig. 5.
Follow the procedure as described in Flue Option 6 ensure the
flue system remains vertical and horizontal.
Mark the wall where the flue will terminate to suit the
installation.
This is the Rear Flue Upwards Extension centre point
position. See Fig. 13.
FLUE OPTION 9.
See Fig. 5.
NOTE: A flue adaptor is required for these flue options.
Refer to Flue Options: 2, 4, 5, 6, 7 and 8.
For installations that require a straight section of flue duct before
the first 90° flue bend, follow the procedure as described in the
appropriate Flue Option. Mark the flue centre point position.
The position for the hole/holes for the flue should be marked on
the wall/walls.
Drill the flue hole/holes 120 mm (4.5in.) diameter, ensure it is
horizontal,through the wall/walls.
If the internal flue fitting kit is used the hole must be 150 mm
(6 in.) diameter.
Depending on site conditions it may be helpful to pre-plumb the
appliance before moving it into position. Fitting unions or stub
pipes to the appliance pipework should be done at this stage.
Refer to Section 3 and Fig. 3.
Pipework must be arranged to clear the flue system. See Section
5b and Fig. 5.
Before the appliance is fitted to the central heating system,
thoroughly flush the heating system and the mains cold water
supply pipe.
17
Flue Option 6.
Centre-line position for
horizontal duct
Flue Option 3.
Rear flue extension
centre point
position
Flue Option 5.
Side flue extension centre
point position. Mark to suit
installation
Flue Option 2.
Side flue centre point
position
Flue Option 4.
Side flue
extension centre
point position
Flue Option 8.
Rear flue upward
extension centre point
position. Mark to suit
the installation. Refer
to Flue Option 6
Flue Option 7.
Side flue centre point
position. Mark to suit
the installation. Refer
to Flue Option 5
Extend the vertical line
250mm approx. above the
position for the flue bend
600
Corner
Corner
715
600
94
94
Side flue application:
Draw a horizontal line from
the rear flue centre point
position in the appropriate
direction
Mark on the floor the base
outline of the appliance
ALL INST
ALLA
TIONS
MUST BE COMMENCED
BY MARKING THIS
POSITION
Flue Option 1.
Rear flue centre
point position. For
all flue options
mark this position
Fig. 13. Marking the flue positions for all flue options.