LW 415R/425R LIFTING TOWERS
LW 415R/425R LIFTING TOWER
INSTALLATION AND USER MANUAL
INSTALLATION AND USER MANUAL
During the tower elevation process, pay attention to the cable rolling.
This cable must the coiled in parallel turns around the winch cylinder NEVER MUST
BE PRODUCED CABLE CROSSES IN DIFFERENT DIRECTIONS.
In this way, that cable can be dangered or got worn, causing, at the end, the break of the cable.
If any spiral is rolled in this way, turn the winch in opposite sense up to release of wrong turn.
Then, proceed to coil again in an appropriated way
Coil direction during
the elevation process
CORRECT MODE
WRONG MODE
The cable must be
coiled in parallel coil
Turned in cross way.
Try to avoid it in order
to keep the cable integrity.
WINCH OPERATION ( SPECIAL CARE)
LOAD
NOTE: BEFORE ELEVATING THE TOWER, CHECK THAT ALL BOLTS ARE
IN BLOCK POSITION.
Blocked bolt
(CORRECT)
Unblocked bolt
(INCORRECT)
Turn the winch smoothness in
clockwise direction, during
this process, the load will
start to elevate with the
support. Be carefull in all
moment with oscillations due
to a defficient load.Continue
with this process up to the
support reach the prefixed heigh.
LIFTING PROCESS
LOAD
L oad located in the most
(Before to folding it)
elevated point
From this moment, the zip system in the profiles start to operate.
To house the security system from the previous profile and
the appropiate insertions in order the bolt of the next profile
elevation process.
Each profile is designed in order to carry out a double objective:
to arrange
acommodate during the
13