a division of Green Leaf, Inc
®
P R E C I S I O N S P R AY E Q U I P M E N T
PSE
®
®
Boom Assembly
PRECISION SPRAY EQUIPMENT
®
, a divison of Green Leaf, Inc. 9490 N BALDWIN ST FONTANET, IN 47851 www.workhorsesprayers.com 888-433-6631
PARTS LIST
DESCRIPTION
PART NUMBER
QTY
ITEM
45" Boom Center Section
640414
1
1
23" Boom End Section
640412
2
2
48" Boom End Section
640413
4
3
Boom Center Bracket
640416
4
4
Boom Arm Bracket
640417
2
5
Boom Spring
640428
4
6
5/16-18 UNC Nut
600172
8
7
5/16-18 UNC Lock Nut
620106
4
8
5/16-18 UNC x 2.75" Hex Bolt
640423
2
9
5/16-18 UNC x 2" Pan Head Screw
640426
8
10
Assembly Instructions
1.0--Install Boom Arm Brackets to Boom End Sections (23" End Sections for 5 Nozzle and 38" End Sections for 7 Nozzle) using
5/16 x 2.75" Hex Bolts, 5/16 x 2" Pan Head Screws, and 5/16 Hex Nuts. Note the orientation and position of these parts as it
is essential for proper assembly.
1.1--Install (2) Boom Center Brackets to each end of the 45" Center Boom Section using 5/16 x 2" Pan Head Screws as shown.
1.2--Install the Boom Hinge Bolts ( 5/16 x 2" Pan Head Screws) Throught the Boom Center Brackets and the Boom End Brackets
as shown in the close up detailed view. Secure in place with the 5/16 Lock Nuts. Making sure not to overtighten bolts so
boom can rotate freely.
1.3--Install the Boom Springs to Boom Center Brackets and 5/16 x 2.75 Hex bolts as shown in the close up detailed view.
1.4--Install the 5/16 Lock Nuts onto 2.75" Hex Bolts to secure the Boom Springs in place. As shown in close up detailed view.
1.5--Install the now completed Boom Assembly to the Square Boom Brackets of the Frame Assembly at the desired height,
using 5/16 x 2.75" Hex Bolts and 5/16 nuts.
10
8
8
6
9
9
7
7
1
10
10
10
10
77
44
44
2
2
77
77
77
9
9
10
10
Summary of Contents for LG405DTS
Page 12: ......