3 of 8
Line of Sight | (800) 463-7731 | los.workriteergo.com
4
Flip Chassis Upside Down Onto Worksurface
4.1 Place the Worksurface and Monitor Bay Lid
upside down on the floor and slide the Monitor
Bay Lid into the cutout in the Worksurface.
4.2 Flip the Chassis assembly upside-down onto the
bottom of Worksurface
Use at least two people to flip over and position
the Chassis.
4.3 Align Chassis assembly so holes in Top Brackets
line up with pre-drilled holes in Worksurface and
holes in Monitor Bay Hinges line up with pre-
drilled holes in Monitor Bay Lid.
5
Mount Chassis Assembly to Worksurface and Monitor Bay Lid
5.1 With Chassis Assembly correctly positioned on Worksurface, attach
Chassis Assembly to Worksurface with eight #10-¾" Phillips Head Screws
(H), four screws per Top Bracket (B & C).
5.2 Note: Chassis models over 48" have a Center Support which requires two
#10-¾" Phillips Head Screws (H) into the Center Support.
5.3 Attach Monitor Bay Lid to both Monitor Lid Hinges with two
#10- ¾" Phillips Head Screws (H) per hinge at the forward location. You will
finish installing the hinges in
Step 10 when workcenter is right side up and
you can more easily access the two other hinge screw holes.
Note: Monitor Bay Lid will
have approximately .2" of
clearance around the cutout in
the Worksurface when properly
installed.
5.4 Attach the Lid Stay to the Monitor Bay Lid with two #10-¾" Phillips Pan Head Screws (H)
(see Adjustment Procedure,
Step 11).
4.1
4.2
4.3
Monitor
Bay Lid
Monitor
Bay Hinge
Worksurface
Lid Stay
Attach to Worksurface
Attach to Monitor Bay Lid
5.1
5.2
5.3
5.4
H
H
H
C
B
H
H
H
Two
screws
H
per hinge at
forward locations
Center Support on
models over 48" wide
H
#10-¾" Phillips Pan
Head Screws
Hardware at actual size