10 of 12
Workrite Ergonomics | 800.959.9675 www.workriteergo.com
Connect Leg Cables, Switch Cable and Power Cord to Control Box
Connect the Leg Cables (N) to the ports “1” & “2” on both sides of the Control Box (I).
Insert the Switch Cable into port “A1” on the Control Box (I).
N
N
O
I
I
Right Leg Cable (P) into Port “1”
Switch Cable into Port “A1”
Power Cord (Q ) into Port “AC”
Left Leg Cable into Port "2"
b
a
b
a
a
11
N
N