background image

10 of 12  

Workrite Ergonomics  |  800.959.9675  www.workriteergo.com

Connect Leg Cables, Switch Cable and Power Cord to Control Box

Connect the Leg Cables (N) to the ports “1” & “2” on both sides of the Control Box (I).
Insert the Switch Cable into port “A1” on the Control Box (I). 

N

N

O

I

I

Right Leg Cable (P) into Port “1” 

Switch Cable into Port “A1”

Power Cord (Q ) into Port “AC” 

Left Leg Cable into Port "2"

b

a

b

a

a

11

N

N

Summary of Contents for SEHX54-72*

Page 1: ... 72 SEHXL54 72 Styled or Flat Foot Kit Standard or Programmable Switch Worksurface E 4 mm Allen Wrench Qty 1 NLeg Cable 1 meter Qty 2 OPower Cord Qty 1 K Cable Spool Qty 2 M3 16 Cable Loops Qty 10 B Short Bracket Qty 2 I Control Box Qty 1 HFoot Glide Qty 4 C Left End Bracket Qty 1 D Right End Bracket Qty 1 F M6 14 mm Flat Head Cap Screw Qty 20 L 8 Pan Head Screw Qty 12 G 12 Pan Head Laminate Top S...

Page 2: ...o persons 1 Unplug from outlet before putting on or taking off parts 2 Close supervision is necessary when this furnishing is used by or near children invalids or disabled persons 3 Use this furnishing only for its intended use as described in these instructions Do not use attachments not recommended by the manufacturer 4 Never operate this furnishing if it has a damaged cord or plug if it is not ...

Page 3: ...n securely Layout Legs and Brackets Lay out Legs A and Brackets B C D Q and R on the floor 61 55 49 43 S S S S H Q Q Q Q Q Q Q Q R R R R 2 1 D Q Q A A C B B R To avoid stripping the threads always insert and make the first few turns of the screw BY HAND with an Allen wrench E ensuring it is in straight 52 Workcenters 58 Workcenters 64 Workcenters 70 Workcenters S M6 12 mm Flat Head Cap Screw Hardw...

Page 4: ...m Flat Head Cap Screws F Note The Right End Bracket will be on your left and vice versa when the assembly is seen upside down Tighten securely B B D C F F F F F F To avoid stripping the threads always insert and make the first few turns of the screw BY HAND with an Allen wrench E ensuring it is in straight Left Leg Right Leg Right End Bracket Left End Bracket front Rear Bracket Assembly Q R a a a ...

Page 5: ...orksurface Attach at the four corner locations using 12 Pan Head Laminate Top Screws G If you use an electric screwdriver be sure it is on the lowest torque setting to avoid stripping the holes in the top With frame set positioned and the four corner screws secure attach frame set using the remaining 12 Pan Head Laminate Top Screws G Skip to Step 6 G 3 screws per Short Bracket 2 screws per End Bra...

Page 6: ...ons using 12 Pan Head Laminate Top Screws G If you use an electric screwdriver be sure it is on the lowest torque setting to avoid stripping the holes in the top With frame set positioned and the six corner screws secure drill pilot holes first then attach the frame set using the remaining 12 Pan Head Laminate Top Screws G 6 125 6 125 23 30 C e n t e r P a r a l l e l t o e d g e front 5 a b a a b...

Page 7: ...in the same manner Loop Power Cord through Strain Relief on Control Box Loop the Power Cord O thought the strain relief channel on the bottom of the Control Box I as shown Leave eight inches of slack to rout cord Plug Power Cord O into port AC on the Control Box I Lay the Control Box down in installation location with cables in place Standard Switch Programmable Switch or 8 8 a a b b b 6 O O 7 H L...

Page 8: ...e as shown Remove Control Box and drill pilot holes where marked Do not drill all the way through worksurface With Control Box I positioned over pilot holes attach with two 12 2 Flat Head Screws J Attach Cable Spool K with the 12 Pan Head Screw G to underside of worksurface If you do not have a Workrite worksurface mount Cable Spools K in a convenient location between Legs and Control Box Lay out ...

Page 9: ...way while leaving enough slack to just reach the Control Box I Attach Cable Loops M to underside of worksurface using 8 Pan Head Screw L making sure to wrap the Cable Loop around the cable prior to attaching If you do not have a Workrite worksurface attach cable loops in convenient locations between Legs or Switch and the Control Box L 8 Pan Head Screw I b b b a a a c 10 L L L M K K M M Hardware a...

Page 10: ...d Power Cord to Control Box Connect the Leg Cables N to the ports 1 2 on both sides of the Control Box I Insert the Switch Cable into port A1 on the Control Box I N N O I I Right Leg Cable P into Port 1 Switch Cable into Port A1 Power Cord Q into Port AC Left Leg Cable into Port 2 b a b a a 11 N N ...

Page 11: ...lete this initialization step or your workcenter will NOT function properly Cleaning Instructions To clean the Sierra legs apply cleaner to a soft cloth Suggested cleaners Windex or Formula 409 Do not use solvents and do not saturate or spray cleaners directly onto workcenter base Hold down the down arrow until workcenter moves slightly upwards Parts Accessories Visit http workriteergo com documen...

Page 12: ...12 of 12 Workrite Ergonomics 800 959 9675 www workriteergo com 1500273 Rev C ...

Reviews: