1. Each installation site must be evaluated and the proper securing method determined by the

installer. Some soils require staking or securing different from that which was provided with the
tent.

2. Good judgment and common sense must be used along with installation guidelines. It is the

responsibility of the tent installer/maintainer to anticipate the severity of the weather along with
the proper time and method of setup and take down. Evacuation of the tent is recommended
before weather becomes extreme. A successful event is a safe event.

3. Proper safety equipment, such as hard hats, steel toe shoes, and safety glasses, should be used

to ensure a safe setup and take down.

ASSEMBLY INSTRUCTIONS

MODEL

MQ1020

PEAK MARQUEE TENT

CAUTION

IMPORTANT:

PLEASE READ INSTRUCTIONS PRIOR TO ERECTING THE TENT.

PROPER INSTALLATION WILL ENSURE MAXIMUM USAGE AND

STABILITY OF THIS STRUCTURE.

IF FURTHER INFORMATION OR CLARIFICATION OF ANY PART OF

THE ENCLOSED INSTRUCTION IS REQUIRED, PLEASE CONTACT:

WARNER SHELTER SYSTEMS LIMITED

1-800-661-6155 OR E-MAIL: warner@wssl.com

..\graphicshome\Marquee\Manuals\MQ1020\MQ1020 Manual 2007.FH11

Summary of Contents for MQ1020

Page 1: ...ent is recommended before weather becomes extreme A successful event is a safe event 3 Proper safety equipment such as hard hats steel toe shoes and safety glasses should be used to ensure a safe setu...

Page 2: ...be replaced immediately Before unloading review the proposed location of the tent In doing so take into account the following Hazards Locate mark and avoid any overhead or underground electrical phon...

Page 3: ...STAKE 3 4 34 8 10666 17 FLAG POLE EXT 1 9523 DROP SHEET 1 10578 19 CABLE SLIDING WALL10 as required 10675 20 CABLE SLIDING WALL 20 as required 10673 21 BASE MQ ADJ 24 4 11064 22 GUY ROPE as required 1...

Page 4: ...om Cross Cable 5 diagonally in square frame by hooking the cable end loop to the corner pin Corner Pin Cross Cables 5 2 6 5 CORNER 90 2 MIDJOINT 6 EVE TUBE 10 CROSS CABLE 4 POST BASE 8 CENTREPOLE 1 TE...

Page 5: ...STEP 8B on PAGE 7 Step 8 Step 6 If Sliding Walls are to be installed attach the Cable for Slide Wall 20 to the Corners and tighten with turnbuckle Step 7 TENT TOP INSTALLATION Step 8A Attach one segme...

Page 6: ...t the intersection push down bottom cable while pulling up the top cable to set both cables directly below the Centrepole sleeve Secure the Centrepole to the cables using the Lock Pin Top Cross Cable...

Page 7: ...by installer to determine proper securing method Site conditions may require anchorage different from what was provided with the structure graphicshome Marquee Manuals MQ1020 MQ1020 Manual 2007 FH11...

Page 8: ...de Wall is properly tensioned Tighten with turnbuckle if needed 1 Clip walls to Cable Slide Wall as shown below 2 Slide the wall towards the other end 3 Secure top wall strap wall straps to Eve Tube 4...

Page 9: ...the opposite side 3 Attach clips to Cable Slide Wall 5 Insert lapels between two posts Loosen toggle ropes to slip lapels underneath it 6 Spread lapels under valance 7 Insert the strap on the lapel t...

Page 10: ...ning Posts 15 Drive two Stakes through each Post Base 16 Tension each toggle rope 17 Install Walls Joiners or Guy Ropes if needed 18 Make final inspection to ensure everything is in operational condit...

Page 11: ...cally the fabric should be cleaned in place or when dismantled Using mild detergent water and a deck mop clean wipe the fabric roof or walls Let dry Repair any damage to the fabric using a WSSL Fabric...

Page 12: ...s height over a stage at one end and bleacher seating at the other These tents singularly or joined together create a large attractive clearspan interior The WSSL Clearspan Series structures are desig...

Reviews: