Warner Shelter Systems Limited

PAGE 2

Table of Contents

Tent Location

1.)

TENT LOCATION................................................................................................

2

2.)

PARTS LIST AND PARTS NUMBER

.................................................................. 3

3.)

FRAME ASSEMBLY

........................................................................................ 4-5

Post & Centrepole Assembly .................. Step 2....................... PAGE

4

Upper Frame Assembly  ......................... Step 3....................... PAGE

4

Cross Cable Installation  ......................... Step 4 & 5 ................ PAGE

4

Cable: Slide Wall Installation (optional)

... Step 6....................... PAGE

5

4.)

TENT TOP INSTALLATION

................................................................................. 5

Protecting Tent Top ................................. Step 7....................... PAGE

5

Unfolding Tent Top  ................................. Step 8 ...................... PAGE 

5

Securing Tent Top to Frame ................... Step 8A/8B .............. PAGE

5

5.)

ERECTING THE TENT 

................................................................................... 6-7

Installing Posts  ....................................... Step 9 ...................... PAGE

6

Installing Centrepole ............................... Step 10 & 11 ............ PAGE

6

Securing the Structure  ........................... Step 13 & 14  ........... PAGE

7

6.)

WALL INSTALLATION

......................................................................................... 8

7.)

JOINER INSTALLATION 

............................................................................... 9-10

8.)

SUMMARY

........................................................................................................ 10

9.)

CARE FOR YOUR VINYL TOPS 

..................................................................... 11

10.)

MAINTENANCE

............................................................................................... 11

VERY IMPORTANT!
Ascertain tops, guys, and other tent parts are in good operating condition. Any

components showing damage should be replaced immediately.

Before unloading, review the proposed location of the tent. In doing so, take into

account the following:

Hazards

Locate, mark, and avoid any overhead or underground electrical, phone, gas,
sprinkler or other lines. Take note and always be aware of any and all hazards. DO
NOT BEGIN ANY ASSEMBLY UNTIL THE HAZARDS HAVE BEEN MARKED AND
CAN BE SAFELY AVOIDED.

Access

Plan the best route for bringing the tent and equipment for the setup onto and off
the site.

Drainage

Attempt to influence the location of the tent so that rain or melting snow can drain
away.

Obstacles

A clean, level and unobstructed site will provide an easy assembly of the tents.

Weather

Do not attempt to setup the tent during thunderstorms, high winds or other extreme
conditions.

Safety

Before the set up, instruct the crew on safety procedures. All local safety and fire
regulations must be followed.

ALL SITE PERSONNEL MUST FOLLOW OCCUPATIONAL HEALTH AND SAFETY PROCEDURES.

PAGES

..\graphicshome\Marquee\Manuals\MQ1020\MQ1020 Manual 2007.FH11

Summary of Contents for MQ1020

Page 1: ...ent is recommended before weather becomes extreme A successful event is a safe event 3 Proper safety equipment such as hard hats steel toe shoes and safety glasses should be used to ensure a safe setu...

Page 2: ...be replaced immediately Before unloading review the proposed location of the tent In doing so take into account the following Hazards Locate mark and avoid any overhead or underground electrical phon...

Page 3: ...STAKE 3 4 34 8 10666 17 FLAG POLE EXT 1 9523 DROP SHEET 1 10578 19 CABLE SLIDING WALL10 as required 10675 20 CABLE SLIDING WALL 20 as required 10673 21 BASE MQ ADJ 24 4 11064 22 GUY ROPE as required 1...

Page 4: ...om Cross Cable 5 diagonally in square frame by hooking the cable end loop to the corner pin Corner Pin Cross Cables 5 2 6 5 CORNER 90 2 MIDJOINT 6 EVE TUBE 10 CROSS CABLE 4 POST BASE 8 CENTREPOLE 1 TE...

Page 5: ...STEP 8B on PAGE 7 Step 8 Step 6 If Sliding Walls are to be installed attach the Cable for Slide Wall 20 to the Corners and tighten with turnbuckle Step 7 TENT TOP INSTALLATION Step 8A Attach one segme...

Page 6: ...t the intersection push down bottom cable while pulling up the top cable to set both cables directly below the Centrepole sleeve Secure the Centrepole to the cables using the Lock Pin Top Cross Cable...

Page 7: ...by installer to determine proper securing method Site conditions may require anchorage different from what was provided with the structure graphicshome Marquee Manuals MQ1020 MQ1020 Manual 2007 FH11...

Page 8: ...de Wall is properly tensioned Tighten with turnbuckle if needed 1 Clip walls to Cable Slide Wall as shown below 2 Slide the wall towards the other end 3 Secure top wall strap wall straps to Eve Tube 4...

Page 9: ...the opposite side 3 Attach clips to Cable Slide Wall 5 Insert lapels between two posts Loosen toggle ropes to slip lapels underneath it 6 Spread lapels under valance 7 Insert the strap on the lapel t...

Page 10: ...ning Posts 15 Drive two Stakes through each Post Base 16 Tension each toggle rope 17 Install Walls Joiners or Guy Ropes if needed 18 Make final inspection to ensure everything is in operational condit...

Page 11: ...cally the fabric should be cleaned in place or when dismantled Using mild detergent water and a deck mop clean wipe the fabric roof or walls Let dry Repair any damage to the fabric using a WSSL Fabric...

Page 12: ...s height over a stage at one end and bleacher seating at the other These tents singularly or joined together create a large attractive clearspan interior The WSSL Clearspan Series structures are desig...

Reviews: