Warner Shelter Systems Limited

PAGE 13

Summary

11. Joiner should smoothly follow the

catenary curve.

10. From inside, fasten joiner and wall velcro

together to hide posts.

8. Fix downspout and tension toggle rope.

9. Fasten Tent Top

velcros from top to
bottom over the
lapel. Flatten well
for a neat seal. =>

* Make sure

downspout is
free to pass
water.

<= Correctly installed

joiner.

1. Check parts.

2. Assemble Corner 120°, Eve Tubes,

Midjoints to form upper frame.

3. Install Cross Cables.

4. Spread Drop Sheet over Cross Cables

to protect the Tent Top.

5. Unfold Tent Top.

6. Attach Tent Top webbings to corner loops.

7. Install Posts. Secure with Lock Pin and

insert the s-hook of the toggle rope into
the hole at the Post Base.

8. Move Drop Sheet to clear Cross Cable

intersection area

9.   Insert Centrepole through the centre socket.

10. Install Flag from outside.

11. Install Centrepole over the Cross Cable

intersecting point.

12. Remove and fold Drop Sheet.

13. Install remaining Posts.

14. Drive Stakes through each Post Base.

15. Tension each toggle rope.

16. Install Guy Ropes, Walls, Joiners.

17. Make final inspection to ensure everything is

in operational condition.

18. Clean up site.

To take down the tent,  reverse the preceding installation steps.

..\graphicshome\Marquee\Manuals\MQHEX\MQ17Hex Manual 2007.FH11

Summary of Contents for MQ17 HEX

Page 1: ...tent is recommended before weather becomes extreme A successful event is a safe event 3 Proper safety equipment such as hard hats steel toe shoes and safety glasses should be used to ensure a safe se...

Page 2: ...ly Before unloading review the proposed location of the tent In doing so take into account the following Hazards Locate mark and avoid any overhead or underground electrical phone gas sprinkler or oth...

Page 3: ...d 10959 OPTIONS PLAIN CLEAR MESH FRENCH WINDOW BAY WINDOW ZIPPER DOOR FRAME ITEM PART QTY STEEL ALUM POST 8 2 11 12 13 14 15 16 3 4 5 6 7 8 9 10 6 10590 10591 BASE MQ FLAT 6 10514 BOLT 5 16 3 NC 6 409...

Page 4: ...ng Bolts C and Nuts D A POST BASE C D Step 3 CENTREPOLE ASSEMBLY Assemble the Centrepole 6 using the same type of Bolts and Nuts Step 4 Assemble perimeter frame Assemble Corner 120 3 and Eve Tubes 5 b...

Page 5: ...ables 1 2 5 4 6 3 1 2 5 4 6 3 Step 7 Drop Sheet PROTECTING TENT TOP 4 Install first Cross Cables 4 from corners 1 to 6 by hooking the cable end loop over the corner pin NOTE The corners are numbered f...

Page 6: ...as shown in STEP 8A on PAGE 7 Pull the upper layer of the Tent Top toward the adjacent frame section Pull the next upper layer of the Tent Top to the opposite frame section Attach webbings 3 4 to cor...

Page 7: ...the first Post lift one corner and slide the Post on the Corner sleeve SEE 9 1 ATTACHING WEBBING TO CORNER HOOK ERECTING THE TENT Repeat the procedure for the adjacent 2 posts INSTALLING POSTS DRAWING...

Page 8: ...ntersection of the Cross Cable Install the Flag on the Centrepole from the outside Step 10 CENTREPOLE INSTALLATION Drop Sheet Install Flag Align the Centrepole Sleeve and lower it over the intersectin...

Page 9: ...pole sleeve Secure the Centrepole to the cables using the Lock Pin Top Cross Cable Bottom Cross Cables Step 13 Step 12 Straighten Posts and drive two Stakes 8 at each Post Base NOTE If the weather wil...

Page 10: ...ns may require anchorage different from what was provided with the Tent SECURING TENSION STRAPS Step 15 graphicshome Marquee Manuals MQHEX MQ17Hex Manual 2007 FH11 D rings Tension the Tent Top by tigh...

Page 11: ...llation Before installing walls make sure toggle ropes are evenly tensioned and the Tent Top is evenly positioned on the frame Check that Cable for Slide Wall is properly tensioned Tighten with turnbu...

Page 12: ...posite side 3 Attach clips to Cable Slide Wall 5 Insert lapels between two posts Loosen toggle ropes to slip lapels underneath it 6 Spread lapels under valance 7 Insert the strap on the lapel through...

Page 13: ...old Tent Top 6 Attach Tent Top webbings to corner loops 7 Install Posts Secure with Lock Pin and insert the s hook of the toggle rope into the hole at the Post Base 8 Move Drop Sheet to clear Cross Ca...

Page 14: ...lly the fabric should be cleaned in place or when dismantled Using mild detergent water and a deck mop clean wipe the fabric roof or walls Let dry Repair any damage to the fabric using a WSSL Fabric R...

Page 15: ...Warner Shelter Systems Limited PAGE 15 Notes graphicshome Marquee Manuals MQHEX MQ17Hex Manual 2007 FH11...

Page 16: ...ly or joined together create a large attractive clearspan interior The WSSL Clearspan Series structures are designed engineered and manufactured in our CWB certified plant The open web truss galvanize...

Reviews: