11. Joiner should smoothly follow the
catenary curve.
10. From inside, fasten joiner and wall velcro
together to hide posts.
8. Fix downspout and tension toggle rope.
9. Fasten Tent Top
velcros from top to
bottom over the
lapel. Flatten well
for a neat seal. =>
* Make sure
downspout is
free to pass
water.
<= Correctly installed
joiner.
1. Check parts.
2. Assemble Corner 120°, Eve Tubes,
Midjoints to form upper frame.
3. Install Cross Cables.
4. Spread Drop Sheet over Cross Cables
to protect the Tent Top.
5. Unfold Tent Top.
6. Attach Tent Top webbings to corner loops.
7. Install Posts. Secure with Lock Pin and
insert the s-hook of the toggle rope into
the hole at the Post Base.
8. Move Drop Sheet to clear Cross Cable
intersection area
9. Insert Centrepole through the centre socket.
10. Install Flag from outside.
11. Install Centrepole over the Cross Cable
intersecting point.
12. Remove and fold Drop Sheet.
13. Install remaining Posts.
14. Drive Stakes through each Post Base.
15. Tension each toggle rope.
16. Install Guy Ropes, Walls, Joiners.
17. Make final inspection to ensure everything is
in operational condition.
18. Clean up site.
To take down the tent, reverse the preceding installation steps.