Commissioning
97
3
Commissioning
3.1
Scope of delivery
l
Laboratory measuring instrument, inoLab pH/ION Level 2
l
Operating manual and short manual in the cover of the
printer
l
4 x type AA Mignon 1.5 V batteries
l
Plug-in power supply
3.2
Initial commissioning
Perform the following activities:
l
Set the date and time
l
Connect the plug-in power supply (for printer functions).
1 Press and hold down the
m
key.
2 Press the
e
key.
The display test appears briefly on the display.
The measuring instrument then switches
automatically to the setting of the baud rate.
3 Press the
g
key repeatedly until the date flashes on
the display.
4 Set today’s date by pressing
u d
.
5 Confirm with
g
.
The date (month) flashes on the display.
6 Set the current month by pressing
u d
.
7 Confirm with
g
. The year appears on the display.
8 Set the current year by pressing
u d
.
9 Confirm with
g
. The hour field flashes on the display.
10 Set the current time by pressing
u d
.
11 Confirm with
g
.
The minutes field flashes on the display.
12 Set the current time by pressing
u d
.
Setting the date
and time
Summary of Contents for inoLab Oxi Level 2
Page 12: ...Safety 96 ...
Page 78: ...Technical Data 158 ...
Page 81: ...Appendix 165 9 Appendix ...