background image

1x

Crossbeam

Connect the two Bases together using the Crossbeam.

The Left and Right Bases can be distinguished by the opening for the 

Upright Beam that faces inward.

STEP ONE

X Training Equipment • support@xtraining.com • (877) 348-7464

4x

110mm M12 Bolt

8x

M12 Washer

4x

M12 Nuts

1

2 3 4

Upright Bracket

facing inward

Upright Bracket

facing inward

1x

Left Base

1x

Right Base

Summary of Contents for X-2 SQUAT STAND

Page 1: ...X 2 SQUAT STAND ASSEMBLY GUIDE X Training Equipment support xtraining com 877 348 7464...

Page 2: ...use beyond a simple bench press and squat station This stand is a popular option for those who do not want to do any floor or wall mounting and is moveable The pull up bar is adjustable up to 99 tall...

Page 3: ...raining Equipment support xtraining com 877 348 7464 19mm Ratchet WHAT S INCLUDED 19mm Wrench 2x Upright Beam 1x Left Base 1x Right Base 2x J Cup 16x 110mm M12 Bolt 32x M12 Washer 16x M12 Nuts 1x Cros...

Page 4: ...ases can be distinguished by the opening for the Upright Beam that faces inward STEP ONE X Training Equipment support xtraining com 877 348 7464 4x 110mm M12 Bolt 8x M12 Washer 4x M12 Nuts 1 2 3 4 Upr...

Page 5: ...o each Base making sure the J Cup holes are facing out as shown below STEP TWO X Training Equipment support xtraining com 877 348 7464 1 2 3 4 8x 110mm M12 Bolt 16x M12 Washer 8x M12 Nuts J Cup holes...

Page 6: ...t the Pull Up Bar to the Upright Beams at desired height STEP THREE X Training Equipment support xtraining com 877 348 7464 1 2 3 4 4x 110mm M12 Bolt 8x M12 Washer 4x M12 Nuts 1x Pull up Bar 87 91 95...

Page 7: ...Place your J Cups at desired height STEP FOUR X Training Equipment support xtraining com 877 348 7464 1 2 3 4 2x J Cup...

Page 8: ...Congrats your X 2 Squat Stand is now complete It is important to check your bolts are securly tightened before every use COMPLETE X Training Equipment support xtraining com 877 348 7464...

Reviews: