32
XPLORE 120/12 Battery Charger Owner's Guide
Step 5: Powering Up
Make one last check that all connections are correct and secure.
The XPLORE Charger may now be powered up.
1. Close the DC disconnect switch or breaker.
2. Switch the AC (mains) power on at the source breaker. It is
normal to see a seven to ten second delay while the charger
powers up.
NOTE:
Battery qualification may not be correctly performed if AC
power is switched on first.
NOTE:
The onboard status LEDs will also illuminate momentarily
with DC power alone when DC power is applied and the minimum
battery voltage (that is, the connected batteries) is above 9 V.
Figure 16 LEDs when powered
Status
Power
Standby
Error
Bank
1
2
Battery
Type
3
4
5
6
FLD
GEL
LFP
AGM
CUS
FLD
GEL
LFP
AGM
CUS
Summary of Contents for 819-0120-12
Page 1: ...XPLORE 120A 12V Battery Charger Owner s Guide Model XPLORE 120 12 Battery Charger 819 0120 12...
Page 12: ...This page is intentionally left blank 2...
Page 18: ...This page is intentionally left blank 2...
Page 24: ...This page is intentionally left blank 2...
Page 60: ...This page is intentionally left blank 2...
Page 72: ...975 1038 01 01 Rev C 31021 http www xantrex com 1 800 670 0707 1 408 987 6030 Printed in...