Wiring
975-0289-01-01
3–13
Figure 3-11
Preparing the Knockouts
4. Secure the AC Accessory Plate to the
opening where you removed the AC
cord and with the 3 Phillips screws
removed with the other plate.
3. Locate the AC Accessory
Plate and remove one or the two
of the knockouts depending on
whether both input and output
wiring will be needed.
If only input is needed, then only
remove one knockout.
5. Remove any DC knockouts required
for installing DC input from Renewable
Energy Sources.
IMPORTANT:
Be sure to install approved conduit and strain relief in the
knockout holes to protect the wiring from being
damaged by any sharp edges along the hole openings.
If installing AC from a generator,
see Figure 3-12, “Connecting the
AC Input and Output from a
Generator” on page 3–14.
6. Proceed to wiring instructions:
If installing AC from a utility grid,
see Figure 3-13, “Connecting the
AC Input and Output from the
Utility” on page 3–15.
If installing DC from renewable energy
sources, see Figure 3-14, “Connecting
the DC Input (Renewable Energy
Solar Panel)” on page 3–16.
Continued from Figure 3-10.
975-0289-01-01(PowerHub_1800_IG).book Page 13 Thursday, June 4, 2015 9:49 AM
Summary of Contents for PH1800-GFP
Page 2: ...975 0289 01 01 PowerHub_1800_IG book Page 2 Thursday June 4 2015 9 49 AM ...
Page 20: ...ii 975 0289 01 01 PowerHub_1800_IG book Page ii Thursday June 4 2015 9 49 AM ...
Page 30: ...1 10 975 0289 01 01 PowerHub_1800_IG book Page 10 Thursday June 4 2015 9 49 AM ...
Page 66: ...3 26 975 0289 01 01 PowerHub_1800_IG book Page 26 Thursday June 4 2015 9 49 AM ...
Page 74: ...2 975 0289 01 01 PowerHub_1800_IG book Page 2 Thursday June 4 2015 9 49 AM ...
Page 75: ...975 0289 01 01 PowerHub_1800_IG book Page 3 Thursday June 4 2015 9 49 AM ...