Computer Communications with the PV100S
152379 Rev C
2–29
2. Click
O
K
and the following window will appear:
If the directory provided in this window is acceptable for the installation,
proceed to Step 4. If not, click on the
C
HANGE
D
IRECTORY
button and
provide a new name for the desired destination directory.
3. Click on the picture of the computer to continue with the installation.
The following window will appear:
Figure 2-13
GUI Setup Start Window
Figure 2-14
GUI Setup Program Group Window
Summary of Contents for PV100S-208
Page 2: ......
Page 3: ...s PV100S 100 kW Grid Tied Photovoltaic Inverter Operation and Maintenance Manual...
Page 8: ...vi...
Page 14: ...xii...
Page 22: ...xx...
Page 78: ...2 38...
Page 86: ...3 8...
Page 104: ...5 8...
Page 109: ...Appendix A Schematics 152379 Rev C A 5 Figure A 1 Electrical Diagram sample...
Page 116: ...Schematics Appendix A A 12 152379 Rev C This page intentionally left blank...
Page 120: ...Warranty and Return WA 4 152379 Rev C...
Page 123: ......