Fault Code Descriptions
152379 Rev C
4–5
0013
AC Voltage High
S
This fault indicates that the utility
grid voltage is above or rose above
the maximum allowed value of 110%
of nominal Vac for greater than
2 seconds, or 137% of nominal Vac
for greater than 2 cycles. This fault is
auto-clearing. Once the Utility grid
voltage has recovered within the
acceptable operating range, the
PV100S
will qualify the value and
automatically clear this fault and
resume normal operation after
5 minute delay period.
• Utility grid voltage rose
above the allowable
limit
0014
Grid Interface Failed S
This fault indicates that the PV100S
has detected an imbalance of AC
output power of 5 kW or greater
when compared to the DC input
power for more than 6 seconds. This
normally means that the connection
of the PV100S to the grid has failed.
• K1 was opened while
the PV100S was
processing power
• K1 is inoperable
• K3 is inoperable
• SSR1 is inoperable
• TS1 is open
0015
Grid Disconnection
S
This fault indicates that the PV100S
has detected a sudden AC voltage
increase of greater than 40% of the
nominal peak-to-peak value. This
normally is the result of a sudden
disconnection from the Utility grid
while the PV100S was processing
power.
• S1 was opened while
the PV100S was
processing power
0016
DC Contactor
Circuit
S
This fault indicates that upon entering
the Power Tracking State, the
PV100S has detected that the PV
voltage has remained above the PV
Start Voltage threshold even after
commanding the DC contactor to
close. This condition is indicative of a
DC contactor circuit failure.
• K2 is inoperable
• SSR2 is inoperable
• TS1 is open
0020
PV Over-Current
S
This fault indicates that the PV100S
has detected a DC current greater
than the maximum allowed value of
712 Adc.
• CT4 is inoperable
• CCU2 ±15 Vdc Power
Supply is defective
• P3 on CCU2 is loose or
disconnected
• PV system wiring short
Table 4-1
Fault Codes
Error
Code Fault
Source(s)
Fault Type
H=Hardware
S=Software
Fault Description
Possible Causes
Summary of Contents for PV100S-208
Page 2: ......
Page 3: ...s PV100S 100 kW Grid Tied Photovoltaic Inverter Operation and Maintenance Manual...
Page 8: ...vi...
Page 14: ...xii...
Page 22: ...xx...
Page 78: ...2 38...
Page 86: ...3 8...
Page 104: ...5 8...
Page 109: ...Appendix A Schematics 152379 Rev C A 5 Figure A 1 Electrical Diagram sample...
Page 116: ...Schematics Appendix A A 12 152379 Rev C This page intentionally left blank...
Page 120: ...Warranty and Return WA 4 152379 Rev C...