Basic Functional Test
976-0043-01-02
4–5
Confirming Inverter Operation
To confirm that the inverter is operating correctly:
◆
Disconnect the AC input power by turning the input AC power
breaker off or unplugging the AC power cord.
•
The inverter should transfer to inverter mode immediately. This
will be indicated by the INVERT (yellow) LED illuminating.
•
The inverter will begin to produce an low audible “buzz” as it
takes power from the batteries and uses it to power the loads.
•
The loads should continue to operate uninterrupted.
This completes the functional test. If all tests pass, the inverter is ready for
use. If any of the inverter’s internal set points are to be adjusted, consult
the programming chapters of this manual.
Summary of Contents for SW Plus 2524
Page 2: ......
Page 3: ...Sine Wave Plus Inverter Charger Owner s Manual...
Page 82: ...2 48...
Page 105: ...DC Wiring 976 0043 01 02 3 23 Figure 3 13 DC Connections to a Single Inverter...
Page 107: ...DC Wiring 976 0043 01 02 3 25 Figure 3 14 DC Connections to Dual Inverters...
Page 126: ...3 44...
Page 132: ...4 6...
Page 141: ...Menu Map 976 0043 01 02 5 9 Figure 5 10 User Menu Map Part 2...
Page 143: ...Menu Map 976 0043 01 02 5 11 Figure 5 12 Basic Setup Menu Map Part 2...
Page 145: ...Menu Map 976 0043 01 02 5 13 Figure 5 14 Advanced Setup Menu Map Part 2...
Page 146: ...Navigation 5 14 976 0043 01 02 Figure 5 15 Complete User Menu Map...
Page 147: ...Menu Map 976 0043 01 02 5 15 Figure 5 16 Complete Basic Setup Menu Map...
Page 148: ...Navigation 5 16 976 0043 01 02 Figure 5 17 Complete Advanced Setup Menu Map...
Page 250: ...8 32...
Page 274: ...A 16...
Page 308: ...C 18...
Page 312: ...D 4...
Page 316: ...E 4...
Page 338: ...I 6...
Page 342: ...Index IX 4 976 0043 01 02...
Page 343: ......