Installation
Inspection, Cleaning, and Packaging
34
Operating Manual for XDC Series Power Supply
Inspection, Cleaning, and Packaging
Initial
Inspection
When you receive your power supply, do a quick visual check.
1. Ensure that the box contains the power supply, the operating manual, the AC
input cover and strain relief, and the output cover.
2. Inspect the unit for scratches and cracks as well as broken switches, connectors,
or displays.
If the unit is damaged, save all packaging materials and notify the carrier
immediately.
Maintenance
Routine servicing of the power supply is not required except for periodic cleaning.
Whenever a unit is removed from operation, clean the metal surfaces with naphtha
or an equivalent mild solvent, and clean the front panel with a damp cloth using a
weak solution of soap and water. Use low-pressure compressed air to blow dust from
in and around vent openings and components on the printed circuit boards.
Summary of Contents for XDC
Page 2: ......
Page 3: ...Operating Manual for XDC 6000 Watt and 12000 Watt Series Digital Programmable DC Power Supply ...
Page 22: ...List of Figures xx Operating Manual for XDC Series Power Supply ...
Page 180: ...Current Sharing 6000 Watt only Operation 178 Operating Manual for XDC Series Power Supply ...
Page 216: ...SCPI Command Reference Expressions 214 Operating Manual for XDC Series Power Supply ...
Page 228: ...GPIB Performance Specifications 226 Operating Manual for XDC Series Power Supply ...
Page 253: ......