Installation
Inspection, Cleaning, and Packaging
36
Operating Manual for XFR 1.2kW Series Power Supply
Inspection, Cleaning, and Packaging
Initial
Inspection
When you first receive your unit, perform a quick physical check.
1. Inspect the unit for scratches and cracks, and for broken switches, connectors,
and displays.
2. Ensure that the packing box contains the AC input cover and strain relief kit (see
Figure 2.2). For 60 V to 600 V models, check that the box also contains the
output cable strain relief (see Figure 2.6). For all models, the output connector
shield is already installed.
3. Have the service technician check the printed circuit board and its components
if you suspect internal damage.
If the unit is damaged, save all packing materials and notify the carrier immediately.
See packing instructions in “Packaging for Shipping or Storage” on page 38.
Periodic
Cleaning
No routine servicing of the power supply is required except for periodic cleaning.
Whenever a unit is removed from operation, clean the metal surfaces with naphtha
or an equivalent solvent and the front panel with a weak solution of soap and water.
Use low-pressure compressed air to blow dust from in and around components on
the printed circuit boards.
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com