Installation
2–20
975-0400-01-01
Connecting Network Cable Between Multiple Units
Single knockouts on the back and bottom of the XW SCC are provided for routing
the Xanbus network cables. See Figure 2-4 on page 2–6.
See Figure 2-8 on page 2–10 for the location of the XW SCC Xanbus ports.
To connect network cables between multiple units:
1. Remove the wiring compartment cover from each unit.
2. Remove a single knockout from the back or bottom of each XW SCC.
3. Connect the network cable to a Xanbus port in XW SCC #1.
4. Route the cable to XW SCC #2.
5. Connect the network cable to a Xanbus port in XW SCC #2.
6. Connect another network cable to XW SCC #2 and route the cable to the next
device in the network.
7. Ensure the factory-supplied network terminators are inserted into the empty
Xanbus ports in the devices at the beginning and end of the network. There
should be no empty Xanbus ports in any of the XW SCCs.
:
WARNING: Shock hazard
Do not route the network cables in the same conduit or panel as the DC input/output
cables.
WARNING: Shock hazard
Before opening the XW SCC wiring compartment, ensure the PV array and batteries are
disconnected. To reduce the risk of shock, cover the array with an opaque (dark) material.
CAUTION: Equipment damage
Connect only Xanbus-enabled devices.
Although the cabling and connectors used in this network system are the same as ethernet
connectors,
this network is not an ethernet system
. Equipment damage may result from
attempting to connect the XW SCC to different systems.
CAUTION: Unpredictable device behavior
Do not connect one end of the network to the other to make a ring or loop.
Summary of Contents for XW-MPPT60-150
Page 1: ...XW Solar Charge Controller Owner s Manual XW MPPT60 150 ...
Page 2: ......
Page 3: ...XW Solar Charge Controller Owner s Guide ...
Page 12: ...x ...
Page 86: ...5 4 ...
Page 102: ...B 12 ...
Page 109: ......