Installation
2–22
975-0400-01-01
4. Pass the end of the BTS cable through a conduit hole on the XW SCC and
insert the BTS plug into the BTS port. See Figure 2-15.
5. Replace the XW SCC wiring compartment cover.
Important:
The BTS cable must not pass through the same conduit used for PV wiring
and battery cables.
Figure 2-15
Installing the BTS
+
+
–
–
+
+
–
–
xantrex
PV
+
PV
–
BAT
+
BAT
–
B TS
Port
Insert the BTS plug into
the XW SCC BTS port.
Attach the BTS to a
battery terminal or to
the side of a battery.