Commissioning
975-0400-01-01
2–27
Commissioning Units Using a System Control Panel
In systems where an XW System Control Panel (SCP) is present, the SCP is
intended to be the configuration interface. For information about SCP navigation
and menus, see Appendix B, “XW System Control Panel Menus”.
Commissioning units using an SCP involves three separate procedures:
1. Setting the Device Numbers for all XW SCCs.
2. Configuring Connections and Charger Settings for the first XW SCC.
3. Copying settings from the first unit to the other XW SCC.
To set the Device Numbers for all XW SCCs:
1. Ensure the Xanbus network is connected to a Xanbus-enabled inverter to
provide power to the System Control Panel.
2. Close the DC disconnect or use a selector switch to apply battery power to all
of the XW SCCs at the same time. When the XW SCCs are powered up, they
will detect that an SCP is already operating on the network, and be ready for
configuration through the SCP. Do not apply PV power at this point.
3. From the Select Device menu on the SCP, select a XW SCC (each unit should
appear as “MPPT60 00” where the 60 stands for 60A, and the 00 is its device
number).
4. On the MPPT Setup menu, ensure the Advanced Settings item is displayed. If
Advanced Settings are not displayed (and Basic Settings appears as the last
item on the menu), press the up arrow, down arrow and Exit keys together.
(See “Advanced menu” on page B–7.)
5. Select Advanced Settings, then select the Multi Unit Config menu. After
entering the Multi Unit Config menu, the LCD backlight on the XW SCC to
be configured will flash.
6. On the Multi Unit Config menu, select Dev Number and set it to a number
other than 00. Press Enter to confirm the new device number.
The device number can be set to any number between 01 and 31. For the first
XW SCC, 01 is recommended. If you have two charge controllers, simply set
them to 01 and 02.
7. Press Exit until the Select Device menu is displayed.
The XW SCC now appears as MPPT60 01 on the menu.
8. Repeat steps 3 through 7 for the next XW SCC.
When you have set the device number for all XW SCCs, you can configure
Connections and Charger Settings for the first XW SCC.
To configure Connections and Charger Settings for the first XW SCC:
1. On the Select Device Menu, select “MPPT60 01.”
2. Navigate to the Multi Unit Config menu and select Connections.
Summary of Contents for XW-MPPT60-150
Page 1: ...XW Solar Charge Controller Owner s Manual XW MPPT60 150 ...
Page 2: ......
Page 3: ...XW Solar Charge Controller Owner s Guide ...
Page 12: ...x ...
Page 86: ...5 4 ...
Page 102: ...B 12 ...
Page 109: ......