Viewing Operating Status
975-0400-01-01
4–3
Normal Operation
All readings on the XW SCC LCD are refreshed every two seconds. A default
top-level display is available at all times (see Table 4-1). The additional screens
can be displayed by pressing the down arrow or up arrow button. You can also
configure the XW SCC to scroll through each operating screen in sequence
(changing every four seconds). See “Configuring the LCD” on page 3–16.
If there is sufficient energy from the PV array, the default operation screen is
displayed while the XW SCC is charging or not charging (in the “no float” stage
when configured for two-stage charging).
When more than one XW SCC is installed and connected to the Xanbus network,
the default operation screen appears as shown in Table 4-2.
You can view more operation screens by pressing the down arrow button. The
screens appear in the order shown in Table 4-3.
Each screen is displayed for a maximum of 30 seconds. If you do not press a
button during that time period, the LCD shows the default operation screen again.
Table 4-1
Default Operation Screen
Display
a
a.All numbers in this table and following tables are examples only. Your unit’s details and perfor-
mance data will vary.
Description
Output 2902W
60.1V 48.4A
Power being produced by the XW SCC now.
Measured output voltage and output current.
Table 4-2
Multi-Unit Default Operation Screen
Display
Description
System 23825W
55.6V 428.5A
Power being produced by the system now.
Total measured output voltage and output current of all units in
the system.
Summary of Contents for XW-MPPT60-150
Page 1: ...XW Solar Charge Controller Owner s Manual XW MPPT60 150 ...
Page 2: ......
Page 3: ...XW Solar Charge Controller Owner s Guide ...
Page 12: ...x ...
Page 86: ...5 4 ...
Page 102: ...B 12 ...
Page 109: ......