Manual of XZ320 Horizontal Directional Drill
52
Belt inspection
50
Replacement
of
short
connector
If necessary
Replacement of sliding
plate of power head
If necessary
Warning!Close engine and manipulate various handles for
unloading and descend, lock or support various ascending
devices before cutting off hydraulic pipes. Various connectors
shall be covered by thick cloth and loosened by connector nuts to
release residual pressure. Discharged hydraulic oil shall be contained
by container.
2.8.1 Storage battery
Attention! Storage battery shall be cut off during repair, welding
and long-term storage. It shall be inspected every 50 hours.
Keep the storage battery clean without corrosion and brush a
layer of lubrication grease in the cable connectors.
2.8.2 Pipeline inspection
All pipelines shall be inspected every 10 hours to check if there is leakage
or loose connection or not.
2.8.3 Engine belt
The transmission belt drives AC power generator, cooling fan and water
pump. Operating conditions of tension device and idle pulley shall be
inspected every 50 hours to check if belt is in accurate position with
abrasion or not.
2.8.4 Radiator
Check if there are sundries, weeds or sundries or not by inspection every
25 hours. It shall be cleaned by compressed air or water spraying gun if
necessary. Pay attention to not damage cooling fins by high-pressure air or
water. It also shall be inspected constantly during construction under dirty
or weedy conditions.
It shall be cleaned by compressed air or sprinkling every 50 hours. Do not
damage vanes by high-pressure air flow or water flow. Screws can be
detached to remove weeds and dirt in the cover. Dirty engine end of heat
dissipater can be cleaned by cleaner of radiator.
Cooling liquid level of radiator shall be inspected every year or every 600
hours. Please refer to operation manual for engine operation.
top-stm.ru
Summary of Contents for XZ320
Page 1: ...t o p s t m r u ...