Technical information
DocuTech 61xx Operator Guide
7-7
•
Plan the jobs to minimize the amount of paper left in the
system during the night.
•
Load the paper quantity based on the number of prints
required.
•
When paper is taken from a storage area with a different
humidity or temperature, keep it in the room where it will be
used for at least 48 hours before loading the paper into the
system.
•
To make adjustments to the DocuTech 61xx for the curl in the
paper, refer to the “Routine maintenance” and “Problem
solving” sections of this guide.
Summary of Contents for 6100BD - Phaser Color Laser Printer
Page 8: ...TABLE OF CONTENTS vi DOCUTECH 61XX OPERATOR GUIDE ...
Page 9: ...TABLE OF CONTENTS DOCUTECH 61XX OPERATOR GUIDE vii ...
Page 10: ...TABLE OF CONTENTS viii DOCUTECH 61XX OPERATOR GUIDE ...
Page 24: ...Certifications 2 4 DocuTech 61xx Operator Guide ...
Page 28: ...Introduction 3 4 DocuTech 61xx Operator Guide ...
Page 42: ...System components 4 14 DocuTech 61xx Operator Guide ...
Page 86: ...Routine maintenance 5 44 DocuTech 61xx Operator Guide ...