6/02
3-21
DC1632/2240
Image Quality Specifications
Image Quality
Prelaunch Training/Review
Image Quality Specifications
The following steps are used to set up the machine for the purpose of making test pattern cop-
ies to judge output image color density, balance, and registration.
1.
Set the following Customer Mode Settings to the positions listed:
a.
Output Color - Full Color
b.
Original Type - Photo & Text / Halftone
c.
Lighter/Darker - Auto Contrast
d.
Variable Color Balance - Normal
e.
Color Saturation - Normal
f.
Sharpness - Normal
2.
Place the Color Test Pattern on the platen. Load 11î X 17 or A3 paper into Tray 1. Make
a copy of the test pattern.
3.
Compare the copy to the test pattern. Refer to
Figure 2
and
Table 1
for this evaluation.
Registration and border deletions are checked using the Step Scales on the Geometric Test
Pattern, an example of which is shown in Figure 1. All of the scales are 20mm in height, and
are made up of four 5mm steps. Step 1 will be described as at the top of the Step Scale, and
Step 4 will be described as at the bottom.
Figure 1 Step Scales
Each Step Scale is positioned for a particular paper size and orientation.
Table 2
indicates the
appropriate Step Scales to use for the various paper sizes, orientations and measurement
locations.
1.
Set the following Customer Mode Settings to the positions listed:
ï
Output Color - Full Color
Table 1 Color Specifications Check Locations
AREA
(Fig. 1)
Check for the Following Results
A
Text Reproduction. Each of the seven sentences in this area are fully repro-
duced with no missing letters or portions of letters. The sentences are repro-
duced in Black, Cyan, Magenta, Yellow, Red, Green and Blue.
B
Color Registration. The patterns in location B should be properly registered to
provide Black, Red, Green and Blue lines.
C
Front to Rear Density. The density of both the low density and high density
bands should be uniform from front to rear. This can be tested by folding the
copy in the center and comparing the front side of the copy to the rear side of
the copy at location C. Both the high density and low density locations should
exhibit even front to rear density.
D
Color Gradation. This area should exhibit a decreasing density of each of the
colors from 100% density to 5% density. In a properly adjusted machine, the
10% patches should be visible and the 5% patches should be barely visible or
not visible on the test pattern copy (except for the bottom row).
E
Routine Color. Location E represents three general tests for the machine to
reproduce colors common to customer originals.
Location A is a general skin tone test.
Location B represents the color of grass or other common foliage.
Location C represents the color of the sky.
F
Photo Gradation. Location F is not used for any copy quality evaluation on
this product.
G
IIT Calibration Patches. These patches are scanned for IIT Calibration during
the DC945 IIT Calibration portion of Max Setup.
H
100 Lines/Inch Image. A Moire defect will show on this image. Moire on a 100
Line/Inch image is within specification.
I
175 Lines/Inch Image. This image is used to test for Moire. Depending on the
degree of the defect, moire seen on this image should be considered out of
specification.
Table 2 Geometric Checkout - Step Scale Data.
Paper
Size
Orientation To check:
Step Scales to use (refer to
Figure 2
)
11x17 SEF
Lead
Edge
Side Edge
Trail Edge
LE1 through LE3
SE1 through SE4 (top); SE5 and SE8 (bottom)
TE3
A3 SEF Lead
Edge
Side Edge
Trail Edge
LE 1 through LE3
SE1 through SE4 (top); SE6 and SE7 (bottom)
TE4
8.5x11 SEF
Lead
Edge
Side Edge
Trail Edge
LE 1 and LE2
SE1 through SE3 (top); SE9 (bottom)
TE5
A4 LSEF Lead
Edge
Side Edge
Trail Edge
LE 1 and LE2
SE1 through SE3 (top); SE10 (bottom)
TE6
8.5x11 LEF
Lead
Edge
Side Edge
Trail Edge
LE1 through SE3
SE1 and 2 (bottom) SE6 and SE7 (top)
TE 2
A4 LEF Lead
Edge
Side Edge
Trail Edge
LE1 through SE3
SE5 (top); SE1 and SE2 (bottom)
TE1
Summary of Contents for DocuColor 1632
Page 4: ...6 02 2 DC1632 2240 Prelaunch Training Review Introduction ...
Page 9: ...6 02 vii DC1632 2240 Introduction Prelaunch Training Review Translated Warnings ...
Page 22: ...6 02 xx DC1632 2240 Prelaunch Training Review Introduction ...
Page 24: ...6 02 1 2 DC1632 2240 Prelaunch Training Review Service Call Procedures ...
Page 38: ...6 02 2 8 DC1632 2240 Prelaunch Training Review Status Indicator RAPs ...
Page 44: ...6 02 2 14 DC1632 2240 1 306 Prelaunch Training Review Status Indicator RAPs ...
Page 452: ...6 02 3 2 DC1632 2240 Prelaunch Training Review Image Quality ...
Page 474: ...6 02 3 24 DC1632 2240 Image Quality Specifications Prelaunch Training Review Image Quality ...
Page 486: ...6 02 4 12 DC1632 2240 REP 1 13 Prelaunch Training Review Repairs and Adjustments ...
Page 490: ...6 02 4 16 DC1632 2240 REP 4 4 Prelaunch Training Review Repairs and Adjustments ...
Page 514: ...6 02 4 40 DC1632 2240 REP 5 19 Prelaunch Training Review Repairs and Adjustments ...
Page 568: ...6 02 4 94 DC1632 2240 REP 9 27 Prelaunch Training Review Repairs and Adjustments ...
Page 572: ...6 02 4 98 DC1632 2240 REP 10 3 Prelaunch Training Review Repairs and Adjustments ...
Page 616: ...6 02 4 142 DC1632 2240 REP 12 20 Prelaunch Training Review Repairs and Adjustments ...
Page 624: ...6 02 4 150 DC1632 2240 REP 14 11 REP 14 12 Prelaunch Training Review Repairs and Adjustments ...
Page 638: ...6 02 4 164 DC1632 2240 ADJ 6 1 Prelaunch Training Review Repairs and Adjustments ...
Page 660: ...6 02 4 186 DC1632 2240 ADJ 12 1 Prelaunch Training Review Repairs and Adjustments ...
Page 766: ...6 02 6 2 DC1632 2240 Prelaunch Training Review General Procedures and Information ...
Page 864: ...6 02 7 2 DC1632 2240 Prelaunch Training Review Wiring Data ...
Page 904: ...6 02 7 42 DC1632 2240 Plug Jack Locations Prelaunch Training Review Wiring Data ...
Page 906: ...6 02 7 44 DC1632 2240 Wirenets Prelaunch Training Review Wiring Data Figure 2 ACN Wirenet ...
Page 907: ...6 02 7 45 DC1632 2240 Wirenets Wiring Data Prelaunch Training Review Figure 3 3 3VDC Wirenet ...
Page 917: ...6 02 7 55 DC1632 2240 Wirenets Wiring Data Prelaunch Training Review Figure 13 24VDC 1 of 4 ...
Page 918: ...6 02 7 56 DC1632 2240 Wirenets Prelaunch Training Review Wiring Data Figure 14 24VDC 2 of 4 ...
Page 919: ...6 02 7 57 DC1632 2240 Wirenets Wiring Data Prelaunch Training Review Figure 15 24VDC 3 of 4 ...
Page 920: ...6 02 7 58 DC1632 2240 Wirenets Prelaunch Training Review Wiring Data Figure 16 24VDC 4 of 4 ...
Page 921: ...6 02 7 59 DC1632 2240 Wirenets Wiring Data Prelaunch Training Review Figure 17 24V RTN 1 of 4 ...
Page 922: ...6 02 7 60 DC1632 2240 Wirenets Prelaunch Training Review Wiring Data Figure 18 24V RTN 2 of 4 ...
Page 926: ...6 02 7 64 DC1632 2240 Wirenets Prelaunch Training Review Wiring Data Figure 22 IIT 24V RTN ...
Page 928: ...6 02 7 66 DC1632 2240 Wirenets Prelaunch Training Review Wiring Data Figure 24 DADF 5V RTN ...
Page 936: ...6 02 7 74 DC1632 2240 Wirenets Prelaunch Training Review Wiring Data ...
Page 939: ...6 02 7 77 DC1632 2240 Chain 01 Wiring Data Prelaunch Training Review Figure 3 LVPS Control ...
Page 946: ...6 02 7 84 DC1632 2240 Chain 01 Prelaunch Training Review Wiring Data Figure 10 Monitoring ...
Page 948: ...6 02 7 86 DC1632 2240 Chain 02 Prelaunch Training Review Wiring Data Figure 2 LCD Control ...
Page 955: ...6 02 7 93 DC1632 2240 Chain 03 Wiring Data Prelaunch Training Review Figure 7 PWS Interface ...
Page 956: ...6 02 7 94 DC1632 2240 Chain 03 Prelaunch Training Review Wiring Data Figure 8 Billing ...
Page 957: ...6 02 7 95 DC1632 2240 Chain 03 Wiring Data Prelaunch Training Review Figure 9 Monitoring ...
Page 969: ...6 02 7 107 DC1632 2240 Chain 06 Wiring Data Prelaunch Training Review Figure 2 Image Input ...
Page 1001: ...6 02 7 139 DC1632 2240 Chain 08 Wiring Data Prelaunch Training Review Figure 5 Registration ...
Page 1002: ...6 02 7 140 DC1632 2240 Chain 08 Prelaunch Training Review Wiring Data Figure 6 Monitoring ...
Page 1012: ...6 02 7 150 DC1632 2240 Chain 09 Prelaunch Training Review Wiring Data Figure 10 Development Y ...
Page 1013: ...6 02 7 151 DC1632 2240 Chain 09 Wiring Data Prelaunch Training Review Figure 11 Development M ...
Page 1014: ...6 02 7 152 DC1632 2240 Chain 09 Prelaunch Training Review Wiring Data Figure 12 Development C ...
Page 1029: ...6 02 7 167 DC1632 2240 Chain 09 Wiring Data Prelaunch Training Review Figure 27 Stripping ...
Page 1032: ...6 02 7 170 DC1632 2240 Chain 09 Prelaunch Training Review Wiring Data Figure 30 IBT Cleaning ...
Page 1042: ...6 02 7 180 DC1632 2240 Chain 10 Prelaunch Training Review Wiring Data Figure 3 Fusing ...
Page 1046: ...6 02 7 184 DC1632 2240 Chain 10 Prelaunch Training Review Wiring Data Figure 7 Duplex Drive ...
Page 1047: ...6 02 7 185 DC1632 2240 Chain 10 Wiring Data Prelaunch Training Review Figure 8 Monitoring ...
Page 1055: ...6 02 7 193 DC1632 2240 Chain 12 Wiring Data Prelaunch Training Review Figure 8 Staple Control ...
Page 1056: ...6 02 7 194 DC1632 2240 Chain 12 Prelaunch Training Review Wiring Data Figure 9 Set Eject ...