GP 4 Intermittent Problem RAP, GP 10 Replacing Bill-
Prelaunch Training/Review
General Procedures and Information
ï
wires chafing against components of the machine, especially against moving com-
ponents
ï
misaligned, misadjusted, or incorrectly installed components
ï
slow or slipping clutches; slow or binding solenoids
ï
damaged components
ï
excessive heat, or symptoms of excessive heat, such as the discoloration of a com-
ponent
ï
loose cables or wires
9.
Perform the adjustments for the components that are not in the RAP, but are associated
with the function that is failing. Refer to the BSDs. Check to ensure that the adjustment
CAN BE MADE and that there is an adequate range of adjustment, and that it can be set
to or near the nominal value. Any abnormality that is observed may be an indication of the
cause of the problem. For example, a component can be adjusted to the nominal value,
but it is at the limit of the adjustment range. This is not normal and may be an indication of
the cause of the problem
10. Operate all of the components that are not in the RAP, but are associated with the func-
tion that is failing with DC330 Component Control Refer to the BSDs. Observe the com-
ponents for any symptoms of abnormal operation, such as a hesitation, or an unusual
sound.
11. Replace any components or consumables that are known to be a frequent cause of the
problem. When doing this, consider the cost and time required. If the suspected item is
inexpensive, can be installed quickly, and has a high probability of resolving the problem,
then it is reasonable to replace it.
12. Leave an accurate and detailed record of your actions in the service log. Describe what
you have observed, what actions you took, and the recommended next steps.
GP 10 Replacing Billing PWBs
Description
This procedure is used to maintain serial number and billing data integrity when Billing PWBs
must be replaced.
Procedure
CAUTION
To maintain the integrity of the serial number and billing data never replace all three PWBs at
once. If any of the following billing data PWBs needs replacing, replace them ONE PWB AT A
TIME, according to this procedure:
ï
ESS PWB (
PL 9.1
).
ï
MCU PWB (
PL 9.1
).
ï
ESS NVM PWB (
PL 9.1
).
1.
Connect the PWS. Select dC132 in the DC Quick Pull-down menu.
2.
Compare the serial numbers displayed for the three PWBs with the serial number on the
data plate. Note any that do not agree.
NOTE: If any of the following conditions exist, escalate the call to Field engineering or the
NTC:
ï
The displayed serial numbers match each other but do not match the data plate.
ï
Two or more numbers do not agree with the data plate and the third number
ï
The displayed numbers are all different.
3.
If one serial number does not match the others, the
Set Serial Number
button will
become active. Click on the button. A series of pop-up windows will open. Follow the
instructions on the screen to synchronize the serial numbers.
CAUTION
To maintain the integrity of the serial number and billing data never replace all three PWBs at
once. Replacing all three PWBs at once will cause unrecoverable NVM corruption. If a PWB
needs replacing, only replace ONE AT A TIME. If the problem is not resolved, reinstall the orig-
inal PWB and renter the serial number before attempting to replace a different PWB.
4.
If any PWB will not synchronize, replace that PWB and re-synchronize.
Summary of Contents for DocuColor 1632
Page 4: ...6 02 2 DC1632 2240 Prelaunch Training Review Introduction ...
Page 9: ...6 02 vii DC1632 2240 Introduction Prelaunch Training Review Translated Warnings ...
Page 22: ...6 02 xx DC1632 2240 Prelaunch Training Review Introduction ...
Page 24: ...6 02 1 2 DC1632 2240 Prelaunch Training Review Service Call Procedures ...
Page 38: ...6 02 2 8 DC1632 2240 Prelaunch Training Review Status Indicator RAPs ...
Page 44: ...6 02 2 14 DC1632 2240 1 306 Prelaunch Training Review Status Indicator RAPs ...
Page 452: ...6 02 3 2 DC1632 2240 Prelaunch Training Review Image Quality ...
Page 474: ...6 02 3 24 DC1632 2240 Image Quality Specifications Prelaunch Training Review Image Quality ...
Page 486: ...6 02 4 12 DC1632 2240 REP 1 13 Prelaunch Training Review Repairs and Adjustments ...
Page 490: ...6 02 4 16 DC1632 2240 REP 4 4 Prelaunch Training Review Repairs and Adjustments ...
Page 514: ...6 02 4 40 DC1632 2240 REP 5 19 Prelaunch Training Review Repairs and Adjustments ...
Page 568: ...6 02 4 94 DC1632 2240 REP 9 27 Prelaunch Training Review Repairs and Adjustments ...
Page 572: ...6 02 4 98 DC1632 2240 REP 10 3 Prelaunch Training Review Repairs and Adjustments ...
Page 616: ...6 02 4 142 DC1632 2240 REP 12 20 Prelaunch Training Review Repairs and Adjustments ...
Page 624: ...6 02 4 150 DC1632 2240 REP 14 11 REP 14 12 Prelaunch Training Review Repairs and Adjustments ...
Page 638: ...6 02 4 164 DC1632 2240 ADJ 6 1 Prelaunch Training Review Repairs and Adjustments ...
Page 660: ...6 02 4 186 DC1632 2240 ADJ 12 1 Prelaunch Training Review Repairs and Adjustments ...
Page 766: ...6 02 6 2 DC1632 2240 Prelaunch Training Review General Procedures and Information ...
Page 864: ...6 02 7 2 DC1632 2240 Prelaunch Training Review Wiring Data ...
Page 904: ...6 02 7 42 DC1632 2240 Plug Jack Locations Prelaunch Training Review Wiring Data ...
Page 906: ...6 02 7 44 DC1632 2240 Wirenets Prelaunch Training Review Wiring Data Figure 2 ACN Wirenet ...
Page 907: ...6 02 7 45 DC1632 2240 Wirenets Wiring Data Prelaunch Training Review Figure 3 3 3VDC Wirenet ...
Page 917: ...6 02 7 55 DC1632 2240 Wirenets Wiring Data Prelaunch Training Review Figure 13 24VDC 1 of 4 ...
Page 918: ...6 02 7 56 DC1632 2240 Wirenets Prelaunch Training Review Wiring Data Figure 14 24VDC 2 of 4 ...
Page 919: ...6 02 7 57 DC1632 2240 Wirenets Wiring Data Prelaunch Training Review Figure 15 24VDC 3 of 4 ...
Page 920: ...6 02 7 58 DC1632 2240 Wirenets Prelaunch Training Review Wiring Data Figure 16 24VDC 4 of 4 ...
Page 921: ...6 02 7 59 DC1632 2240 Wirenets Wiring Data Prelaunch Training Review Figure 17 24V RTN 1 of 4 ...
Page 922: ...6 02 7 60 DC1632 2240 Wirenets Prelaunch Training Review Wiring Data Figure 18 24V RTN 2 of 4 ...
Page 926: ...6 02 7 64 DC1632 2240 Wirenets Prelaunch Training Review Wiring Data Figure 22 IIT 24V RTN ...
Page 928: ...6 02 7 66 DC1632 2240 Wirenets Prelaunch Training Review Wiring Data Figure 24 DADF 5V RTN ...
Page 936: ...6 02 7 74 DC1632 2240 Wirenets Prelaunch Training Review Wiring Data ...
Page 939: ...6 02 7 77 DC1632 2240 Chain 01 Wiring Data Prelaunch Training Review Figure 3 LVPS Control ...
Page 946: ...6 02 7 84 DC1632 2240 Chain 01 Prelaunch Training Review Wiring Data Figure 10 Monitoring ...
Page 948: ...6 02 7 86 DC1632 2240 Chain 02 Prelaunch Training Review Wiring Data Figure 2 LCD Control ...
Page 955: ...6 02 7 93 DC1632 2240 Chain 03 Wiring Data Prelaunch Training Review Figure 7 PWS Interface ...
Page 956: ...6 02 7 94 DC1632 2240 Chain 03 Prelaunch Training Review Wiring Data Figure 8 Billing ...
Page 957: ...6 02 7 95 DC1632 2240 Chain 03 Wiring Data Prelaunch Training Review Figure 9 Monitoring ...
Page 969: ...6 02 7 107 DC1632 2240 Chain 06 Wiring Data Prelaunch Training Review Figure 2 Image Input ...
Page 1001: ...6 02 7 139 DC1632 2240 Chain 08 Wiring Data Prelaunch Training Review Figure 5 Registration ...
Page 1002: ...6 02 7 140 DC1632 2240 Chain 08 Prelaunch Training Review Wiring Data Figure 6 Monitoring ...
Page 1012: ...6 02 7 150 DC1632 2240 Chain 09 Prelaunch Training Review Wiring Data Figure 10 Development Y ...
Page 1013: ...6 02 7 151 DC1632 2240 Chain 09 Wiring Data Prelaunch Training Review Figure 11 Development M ...
Page 1014: ...6 02 7 152 DC1632 2240 Chain 09 Prelaunch Training Review Wiring Data Figure 12 Development C ...
Page 1029: ...6 02 7 167 DC1632 2240 Chain 09 Wiring Data Prelaunch Training Review Figure 27 Stripping ...
Page 1032: ...6 02 7 170 DC1632 2240 Chain 09 Prelaunch Training Review Wiring Data Figure 30 IBT Cleaning ...
Page 1042: ...6 02 7 180 DC1632 2240 Chain 10 Prelaunch Training Review Wiring Data Figure 3 Fusing ...
Page 1046: ...6 02 7 184 DC1632 2240 Chain 10 Prelaunch Training Review Wiring Data Figure 7 Duplex Drive ...
Page 1047: ...6 02 7 185 DC1632 2240 Chain 10 Wiring Data Prelaunch Training Review Figure 8 Monitoring ...
Page 1055: ...6 02 7 193 DC1632 2240 Chain 12 Wiring Data Prelaunch Training Review Figure 8 Staple Control ...
Page 1056: ...6 02 7 194 DC1632 2240 Chain 12 Prelaunch Training Review Wiring Data Figure 9 Set Eject ...