8-24
Phaser 34
25
Laser Printer Service Manual
3.
Remove 1 screw securing the Fan retainer (stopper) and remove the fan to the left
while feeding the cable through the printer from the right side.
Reinstallation Notes
Note
If not already done during removal, loosen the screws securing the Laser
Assembly sufficiently to route the fan cable under the laser.
Sub Fan Assembly (PL 9.3.35)
1.
Remove the Top Cover Assembly (page 8-9).
2.
Disconnect the Sub Fan connector CN 21 from the Main Board.
Note
If you wish, you can loosen the screws securing the Laser Assembly and tilt
it to provide additional access to remove the cable. This will be necessary
when routing the cable back under the Laser Assembly during reinstallation.
1.
Stopper
2.
Main Fan
-
1
2
Summary of Contents for Phaser 3425
Page 1: ...Service Manual P h a s e r L a s e r P r i n t e r 3425 ...
Page 2: ......
Page 14: ...xii Phaser 3425 Laser Printer ...
Page 20: ...xviii Phaser 3425 Laser Printer ...
Page 29: ...General Information 1 9 Consumables 1 Print Cartridge 1 ...
Page 48: ...2 14 Phaser 3425 Laser Printer Service Manual ...
Page 93: ...6 Chapter Adjustments and Calibrations In this chapter Margin Calibration Resetting NVRAM ...
Page 98: ...7 4 Phaser 3425 Laser Printer Service Manual ...
Page 144: ...8 46 Phaser 3425 Laser Printer Service Manual ...
Page 145: ...9 Chapter Parts Lists In this chapter Using the Parts List Print Engine Parts Xerox Supplies ...
Page 175: ...10 6 Phaser 3425 Laser Printer Service Manual ...
Page 179: ......
Page 180: ......