Operation
MNC-0400-012
6 of 8
Revision C
Initial Turn On
The Initial Turn On procedure has three parts:
•
Prepower Check.
•
Turn On.
•
Turn Off.
This procedure should be followed to ensure proper operation of
the amplifier and to avoid permanent damage to the amplifier.
Caution
Ensure that all of the following instructions are followed. Failure
to comply could result in permanent damage to the amplifier.
Vorsicht
Stellen Sie sicher, dass alle folgenden Anweisungen befolgt
werden.
Nichtbeachtung kann bleibende Schäden am Verstärker
verursachen.
Prepower Check
1. The prime power voltage is within the specified limits of the
amplifier. The correct power input connector pins must be used,
dependent on voltage level and the prime power source. Refer to
the appendix titled
Mechanical Drawings
for connector pin outs.
2. The amplifier is installed within an enclosure. The exhaust air from
the amplifier should be ducted to the outside of the cabinet so that
the warm air is not recirculated into the amplifier's air intake.
3. The RF output is terminated with a load capable of dissipating the
power of your unit. This load should have a maximum VSWR of
1.5:1. The RF drive signal is within the frequency range of the
amplifier's specification. Refer to the appendix titled
Specifications
for rated power gain.
Caution
Do not exceed the RF input power limit as defined in the
product specification. Doing so will cause the SSPA to
overheat. Failure to comply could result in permanent damage
to the SSPA.
Summary of Contents for XTS-200C
Page 10: ...MNC 0000 010 2 Revision A6...
Page 38: ...MNC 0200 004 14 of 14 Revision C Safety Sicherheit...
Page 64: ...MNC 0300 011 26 of 26 Revision H Unpacking and Installation...
Page 72: ...Operation MNC 0400 012 8 of 8 Revision C...
Page 104: ...MNC 0500 010 32 Revision D Solid State Power Amplifier Communication and Protocol...
Page 122: ...MNC 0700 001 6 Revision F Service and Repair...
Page 131: ......
Page 132: ......
Page 133: ......
Page 134: ......
Page 135: ......
Page 136: ......
Page 137: ......
Page 138: ......
Page 139: ......
Page 140: ......
Page 144: ...MNC 0000 039 4 of 12 Revision 2 ODU SSPA Power Supply Removal...
Page 152: ...MNC 0000 039 12 of 12 Revision 2 ODU SSPA Power Supply Removal...
Page 155: ...MNC 0000 003 3 of 4 Revision B Operation Addendum SSPA M C Termination Cable...
Page 156: ...MNC 0000 003 4 of 4 Revision B Operation Addendum SSPA M C Termination Cable...
Page 160: ...MNC 0000 002 4 Revision A Protocol Adendum Block Upconverter...