Hood Installation
Hang Hood From Ceiling Joists
After the AVI Hood has been installed on top of the ovens and moved into position, it must
be hung from the building structure to relieve the weight from the ovens and to allow the ovens to
be moved for maintenance and cleaning. XLT Ovens supplies two (2), 24” [610mm] long pieces
of Unistrut for installation under the horizontal air duct located in the center of the hood. Shown
below is a typical installation using four (4) pieces of Unistrut and four (4) lengths of 1/2”-13 all-
thread. It is recommended that a flat washer and two (2) nuts be placed under the bottom piece of
Unistrut and over the top piece to prevent the hood from moving after installation is complete.
Please note the final distance from the finished floor to the bottom of the hood must be 69 1/2” +/-
1/8” [/-3.2], measured at all four (4) corners.
Unistrut
Flat Washer
1/2-13 Nuts (2)
1/2-13 All-thread (4 places)
Welded Duct
Ceiling Joist (shown
for reference only)
Finished Floor
69 1/2
±1/8
[1765
±3.2
]
Front fascia panel removed for clarity
Horizontal Duct
Summary of Contents for 1832-AE-B
Page 43: ...43 This page intentionally left blank ...
Page 88: ...This page intentionally left blank ...
Page 95: ...95 Oven Schematic 1832 2440 3240 3255 3855 Square Burner Standard ...
Page 96: ...96 Oven Schematic 1832 2440 3240 3255 3855 Square Burner World ...
Page 97: ...97 Oven Schematic 1832 2440 3240 3255 3855 Round Burner Australia ...
Page 98: ...98 Oven Schematic 3270 3870 Square Burner Standard RH Control Box ...
Page 99: ...99 3270 3870 Square Burner Standard LH Control Box Oven Schematic ...
Page 100: ...100 Oven Schematic 3270 3870 Square Burner World RH Control Box ...
Page 101: ...101 Oven Schematic 3270 3870 Square Burner World LH Control Box ...
Page 102: ...102 3270 3870 Round Burner Australia LH Control Box Oven Schematic ...
Page 103: ...103 Oven Schematic 3270 3870 Round Burner Australia RH Control Box ...
Page 104: ...104 Hood Schematic Standard ...
Page 105: ...105 Hood Schematic World ...