Cable Management
1)
Make sure that the cables are long enough for the lift to go up and down.
2)
Place all the cables inside the cable carrier.
3)
Please check that all the cables are out of the way of operation.
7.
Installing Ceiling Cover
1)
The ceiling cover is fixed at the underside of the lift which normally greater in
size and serve as platform to receive all types of ceiling materials. The lift
must be lowered down in order to fix the ceiling cover frame.
2)
The four angle bars will serve as the ceiling cover frame. ( Fig. below)
3)
Please use
M5 Screw (x8)
to fix the ceiling cover frame and the lift housing.
4)
The ceiling cover is settled to flush with the false ceiling.