7
Method of software upgrading
1. The tools and software demanded
1) Please confirm that PC has the software of ISP_TOOL and install the parallel interface drive
program Port95nt.
2) ISP_TOOL icon is bellow:
3) One parallel cable (25 pins) and one VGA cable (15 pins), the parallel cable connects the PC and
the upgrade instrument, the VGA cable connects the TV and the upgrade instrument.
2. The steps for upgrading software
1) Please confirm that the connection wires and the upgrade instrument are connected well before
the software written and then power on the TV.
2) Double click the icon ISP_TOOL to open it:
3) Press “Connect“ to connect TV, if the connection is done successfully as shown below, then
press “enter”.
Summary of Contents for LC-19HU56S
Page 1: ...LCD TELEVISION LC 19HU56S...
Page 11: ...9 6 Select the document then the window will appear as shown below Select...
Page 18: ...16 2 TDA7266SA The TDA7266SA is a dual bridge amplifier...
Page 20: ...18...
Page 27: ...Main Board Schematic diagrams Page 1 total 8 pages 25...
Page 28: ...Main Board Schematic diagrams Page 2 total 8 pages 26...
Page 29: ...Main Board Schematic diagrams Page 3 total 8 pages 27...
Page 30: ...Main Board Schematic diagrams Page 4 total 8 pages 28...
Page 31: ...Tuner Board Schematic diagrams Page 5 total 8 pages 29...
Page 32: ...IR Key Board Schematic diagrams Page 6 total 8 pages 30...
Page 33: ...Power Board Schematic diagrams Page 7 total 8 pages 31...
Page 34: ...Back light Board Schematic diagrams Page 8 total 8 pages 32...
Page 36: ...APPENDIX B Exploded view LC 19X56 34...
Page 38: ...9219HU5610 Ver 1 0...