background image

 
 PACKING LIST 

 
 

1)  Motosat Dish 

2) 

Motor- assembly, with connected junction box

 

3) 

2,5 mt. Motor control cable

 

4) 

2,5 mt. RG6-U-6 LNB cable

 

5) 

Self-adhesive foam band

 

6)  Motosat Dish Installation Manual 

 
 USAGE 

 

Operating the system; 
First  be  sure  all  the  connections  between  antenna  system,  Controlbox  and  receiver  to 
the loopout port of Controlbox are connected properly.  
 
Press “ ” button on the front panel of the Control panel The LED on the front panel will 
turn on and the system will start to operate. 
 
When  the  system  is  operated,  firstly  the  antenna  is  opened  and  starts  to  search  the 
selected  satellite.  The  satellite  search  is  completed  in  about  25  seconds.  After  the 
satellite is found, the system defines the most suitable antenna position by making fine-
tuning and stops.  
 
After the satellite is found, the signal will be available on the receiver which is connected 
to the loop out port of Controlbox and the channels on the receiver can be watched. 
 
Turn off the system; 
To  turn  off  the  system  press  “ ”  button  on  the  front  panel  of  the  Controlbox,  if  the 
antenna is open it starts to close automatically. The system goes on operating until the 
antenna is closed. The system turns off after closing the antenna. 
When  the  antenna system  is  totally closed,  all  the  LED  indicators  will  be  turned  off  on 
the Control panel.  
 
There  shouldn’t  be  any  physical  obstruction  between  the  antenna  and  satellite.  Tall 
buildings  on  the  roadside,  mountains,  trees,  crossovers,  bridges  and  similar  barriers 
may block to reach the satellite signals to the antenna partly or completely. 
 
The signal receiving performance of the system may decrease during heavy rainfall or 
snowfall.  It  also  happens  if  the  antenna  is  covered  by  snow.  In  such  case,  remove 
gently the snow off the dish. 
 

Summary of Contents for MTA 50

Page 1: ...MTA 50 MTA 65 Serie MTA 80 Serie INSTALLATION MANUEL...

Page 2: ...1...

Page 3: ...E OF CONTENTS Page GENERAL 3 IMPORTANT SAFETY INSTRUCTIONS 3 PACKING LIST 4 USAGE 4 EXEMPTIONS 5 CABLE ENTRY PLATE CONNECTIONS 5 INSTALLATION MANUAL 6 THE CASES THAT SHOULD BE CONSIDERED 6 INSTALLATIO...

Page 4: ...cause damage to the vehicle as well as it will be dangerous for life safety The system shuts down itself and closes the antenna automatically when the vehicle is operated but checking on whether the...

Page 5: ...the satellite is found the signal will be available on the receiver which is connected to the loop out port of Controlbox and the channels on the receiver can be watched Turn off the system To turn of...

Page 6: ...ct and other connected equipment CABLE ENTRY PLATE CONNECTIONS 1 Connect the antenna cable No 1 from LNB and the antenna cable No 2 from Controlbox antenna input to each other by using F connectors 2...

Page 7: ...tallation place of the antenna Installation place should be smooth and plain surface and on the centerline according to the vehicle width While doing installation at rough surfaces the bottoms of the...

Page 8: ...ording the adhesive Fix the motor unit by bonding it to the mounting surface 4 Stick the foam band 40cm far away from the rear middle axis of the antenna after thoroughly cleaning the mounting area of...

Page 9: ......

Page 10: ...9...

Page 11: ......

Page 12: ......

Page 13: ...0 Elevation moving speed 10 second Operating voltage 12 24V DC Operating power consumption 30W Dimensions in closed position 82cm x 104cm x 21cm width x length x height Packed dimensions 83cm x 105cm...

Reviews: